Laserfiche WebLink
Universal Health & Safety Plan FZ, <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> ❑X Other conditions apply(Identify) QUALITY: Sub will use AECOMs <br /> QMS. PM to provide AECOM TQRR <br /> to document review of deliverables <br /> and/or provide oversight of field <br /> services. <br /> CASCADE DRILLING <br /> Subport Supplier Number:103009 <br /> Scope of Work: High-Risk Tasks performed? Contractor Site Safety Officer&Contacts: <br /> Describe Contractor's Scope of Field Work See SWP Cover Sheet for List of High-Risk Tasks Provide Name and Cell Phone <br /> Direct push Drilling and Hand Auger Z Yes(List) 1.Working with hazardous. Kattya Fernandez(925}849-6970 <br /> substances 2. Extreme heat 3. Working <br /> with heavy equipment 4. Working around <br /> mobile equipment 5. Exposure to vehicular <br /> traffic. <br /> ❑ No <br /> Required Subcontractor Documents: <br /> PM must verify that the following documents are in-place for each subcontractor; check to verify. <br /> ❑x Copy of their Project/Site-specific ■ Copy of task specific THAs/JHAs and Z Copy of the signed contract <br /> health and safety plan inspection/tailgate forms <br /> ❑x Copy of their business license and ❑ Copy of their Corporate Safety Z Other Acknowledgement of the <br /> training certificates(task specific) Management Manual cultural sensitivity/resources training <br /> Subport Review: ❑ Approved—Skip to next Subcontractor <br /> ❑X Conditionally Approved- Identify conditions and controls below. <br /> Check`common subport conditions'that apply,add additional conditions,and describe how the conditions will be met <br /> Subport Conditions(check or add any that apply) How will the condition be met? <br /> ❑ AECOM Safety Plan must cover Subcontractor's work, and Subcontractor must <br /> provide a THA for their tasks <br /> ❑X PM must verify that Subcontractor adheres to AECOM safety plan Field oversight and documentation <br /> ❑ Subcontractor variance is required-the form can be found at this link: N/A <br /> https://mvecosystem.aecom.com/ppf/forms/Forms/S3NA 213 FM2 Subcontractor <br /> %20Variance%2OForm.docx <br /> ❑X Supervision required AECOM will be onsite <br /> ❑ Special Conditions apply(related to Demolition, Diving, Underbridge Inspection Unit N/A <br /> work, and Rope Access Work <br /> ❑X Other conditions apply(Identify) Risk:Approved-current COI meets <br /> minimums. QUALITY: Sub will use <br /> AECOMs QMS. PM to provide <br /> oversight of field services. <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4(DSC)AM-209-FM-C) 13 <br /> Revision 12 September 9,2021 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />