Laserfiche WebLink
Limited Phase II Site Assessment Work Plan <br /> TRICO PROPERTY <br /> 1173 North Main Street,Manteca,California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION...................................................................................................1 <br /> 2.0 SCOPE OF WORK................................................................................................1 <br /> 2.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES........................................2 <br /> 2.2. SOIL BORING AND SAMPLING........................................................................2 <br /> 2.3. SOIL AND GROUNDWATER LABORATORY ANALYSIS.................................2 <br /> 2.4. SOIL-VAPOR SAMPLING AND SAMPLING......................................................3 <br /> 2.5. REPORT PREPARATION..................................................................................3 <br /> 3.0. FIELD PROCEDURES..........................................................................................3 <br /> 3.1. SOIL PROBE BORING ADVANCEMENT..........................................................3 <br /> 3.1.1. Soil Sampling...............................................................................................3 <br /> 3.1.2 Grab Groundwater Sampling.......................................................................4 <br /> 3.1.3 Soil-Vapor Sampling&Analysis..................................................................4 <br /> 3.1.4. Boring Abandonment...................................................................................6 <br /> 3.2. EQUIPMENT DECONTAMINATIONM/ASTE MANAGEMENT..........................6 <br /> FIGURES <br /> Figure 1—Site Plan <br />