My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
2060
>
2900 - Site Mitigation Program
>
PR0541575
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2026 4:53:33 PM
Creation date
3/2/2026 4:51:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541575
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0023835
FACILITY_NAME
AMERICAN MEDICAL RESPONSE WEST
STREET_NUMBER
2060
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15523016
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2060 E MAIN ST STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M 2020 AdvancedGea AdvancedCzo <br /> May a^fmWmmo.,,^ace,,.�m May 2020 <br /> Project No. 163924 �, Project No.163924 ^^faor^rmm+Meca^�^y <br /> Page 2 of 6 v ' Page 3 of 6 <br /> 4.0. HAZARD EVALUATION 6.0. ON-SITE WORK PLANS <br /> The following substance(s) or hazards are known or suspected to be on site. Work party(ies)consisting of two persons will perform the following tasks: <br /> SUBSTANCESINVOLVED: CONCENTRATIONS: PROJECT TEAM LEADER: TASK: <br /> Benzene 130 PV Timothy J.Cuellar Oversee operations;site health 8 safety <br /> Toluene 28 pg0 FIELD CREW: TASK: <br /> Ethyl-benzene 75 pg4 Keith Lindgren/Rick Marty Documentation of well destructions;onske <br /> Total xylenes 410 pg0 safety,traffic control <br /> TPH-Diesel 1,400 pgll <br /> The works party(ies)shall be briefed on the content of this plan priorto initiating onsde <br /> TPH-Gasoline 5,300 p90 work. <br /> The additional potential hazards include: Slip-trio-fall hazards, noise, heavy equipment <br /> (i.e.,drill na),vibration hazards,traffic hazards.etc. 7.0. COMMUNICATION PROCEDURES <br /> 5.0. PERSONAL PROTECTIVE EQUIPMENT If hearing is impaired,the following standard hand signals will be used: <br /> Based on evaluation of potential hazards,the following levels of personal protection Hand gripping throat Out of air,cannot breathe <br /> have been designated for the applicable work areas or task Grip partner's west or both hands around waist Leave area immediately <br /> LOCATION: JOB FUNCTION: I LEVELS OF PROTECTION; <br /> Hands on top of head: Need assistance <br /> Exclusion Zone Excavation Area A B C D Other Thumbs up: OK;I am alright; I understand <br /> Reduction Zone Preserve samples A B C D Other Thumbs down: No;negative <br /> Support Zone Support functions JA B C D Other <br /> 8.0. EMERGENCY MEDICAL CARE <br /> Specific protective equipment for each level of protection used is follows: <br /> St Joseph's Medical Center. <br /> hard hat 1800 N California Street <br /> steel-toed boots Stockton,CA 95204 <br /> Level D: half-faced respirator(if necessary) <br /> gloves Route to the hospital <br /> safety glasses Route to the hospital:From the site,head west on Main Street towards North Airport Way, <br /> turn right(north)onto North Airport Way,and then turn left(west)onto East Harding Way. <br /> If air purifying respirators are authorized, organic vapor and dust is the appropriate Turn right(north)on North California Street The Hospital will be on the right(east). <br /> canister for use with the involved substances and concentrations. No downgrading <br /> changes of the specified levels of protection shall be made without the approval of the Local ambulance service is available at phone 911. Their response time is 5 to 10 <br /> site safety officer and the project team leader. minutes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.