Laserfiche WebLink
GHD Services Inc` BORING / WELL LOG <br /> 10969 Trade Center Drive suite 107 <br /> Rancho Cordova, CA 95670 <br /> Telephone: 99-8900 <br /> Fax: 918-889-8-899999 <br /> CLIENT NAME CEMEX BORINGMELL NAME MW-3 <br /> JOBISITE NAME CEMEX Kerlinner Landfill DRILLING STARTED 03-Oct-16 <br /> LOCATION 30131 South MacArthur Drive Tracy, CA DRILLING COMPLETED 04-Oct-16 <br /> PROJECT NUMBER 062322 WELL DEVELOPMENT DATE(YIELDI 19-Oct-16 <br /> DRILLER Cascade LLP GROUND SURFACE ELEVATION 181.50 <br /> DRILLING METHOD Hallow-stem auger TOP OF CASING ELEVATION 184.36 8 above msl <br /> BORING DIAMETER 10 SCREENED INTERVALS 135 to 150 fbg <br /> LOGGED BY B. Sandor DEPTH TO WATER(First Encountered) 130.00 fbg <br /> REVIEWED BY Greg Barclay DEPTH TO WATER(Static) 125.90 fbg 1 <br /> REMARKS Over-drilled well DW-3 and continued to TD for new well MW-3 <br /> 2 G) U U <br /> Oj a uj W�' N aQQ 0 LITHOLOGIC DESCRIPTION z WELL DIAGRAM <br /> 0 mV Q u� o'-' � K� 00. <br /> 0- y p <br /> LU <br /> Former Well DW-3 destroyed by overdrilling to 130 fbg. <br /> Logging and soil sampling for replacement well MW-3 <br /> initiated at 130 fbg. <br /> F <br /> a <br /> M <br /> 0 <br /> � 5 <br /> if <br /> C) <br /> 'a <br /> 01 <br /> 0 <br /> i <br /> rc <br /> F <br /> z <br /> tl 10 <br /> i <br /> x4 <br /> N <br /> w <br /> LL <br /> � 15 <br /> w <br /> O <br /> g¢ <br /> W <br /> O <br /> a <br /> O <br /> O <br /> l� �-20— <br /> contlnuedlvexl Page PAGE f OF 7 <br />