My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30131
>
2900 - Site Mitigation Program
>
PR0545118
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 12:55:53 PM
Creation date
3/3/2026 12:52:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545118
PE
2965 - RWQCB LEAD AGENCY WASTE DISCHARGE SITE
FACILITY_ID
FA0025664
FACILITY_NAME
CEMEX KERLINGER AGGREGATE PLANT
STREET_NUMBER
30131
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95337
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
30131 S MACARTHUR DR TRACY 95337
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} <br /> Bryan Sandor <br /> From: Brian Silva <br /> Sent: Thursday, December 12, 2019 1:00 PM <br /> To: Bryan Sandor <br /> Subject: FW: CEMEX Kerlinger Aggregate Plan Well Repair Work Plan <br /> CompleteRepository: 11205950 <br /> Description: KERLINGER PLANT <br /> JobNo: 11205950 <br /> OperatingCentre: 561 <br /> RepoEmail: 11205950@ghd.com <br /> RepoType: Project <br /> Here is the work plan approval. Will be discussing the approval conditions with CEMEX later today, but in the meantime <br /> please get the permit in as well as scheduling the driller. I have already let CEMEX know that our driller's are not <br /> available until the start of the new year. <br /> Thanks, <br /> Brian Silva <br /> Project Manager <br /> GHD <br /> Proudly employee owned <br /> T: +1 530-387-5713 1 M: +1 916 919 0403 I E: brian.silva(a)and.com <br /> 4080 Plaza Goldorado Circle Suite 8 Cameron Park CA 95682 USA I www.ohd.com <br /> Connect <br /> 0 Q 0 0 <br /> WATER I ENERGY&RESOURCES I ENVIRONMENT I PROPERTY&13UILDINGS I TRANSPORTATION <br /> Please consider our environment before printing this email <br /> From: Kenny, Brendan@Waterboards<Brendan.Kenny@waterboards.ca.gov> <br /> Sent:Wednesday, December 11, 2019 3:57 PM <br /> To: Brian Silva <Brian.Silva@ghd.com> <br /> Cc: Kenny, Brendan @Waterboards<Brendan.Ken ny@waterboards.ca.gov> <br /> Subject: RE: CEMEX Kerlinger Aggregate Plan Well Repair Work Plan <br /> Brian, <br /> The workplan is approved with the following conditions. If the well can be repaired,the sampling protocol will need to <br /> be modified to demonstrate sufficient drawdown into the well screen interval to ensure representative sample <br /> collection for oil and grease. If the well cannot be repaired,then the new well to be installed in the existing boring shall <br /> be designed and installed with a sufficient length of well screen to intersect the water table. The well screen shall not <br /> exceed 20 feet in length. <br /> Let me know if you have any questions. <br /> Brendan <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.