My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
521
>
2900 - Site Mitigation Program
>
PR0548636
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 1:37:52 PM
Creation date
3/3/2026 1:07:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548636
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0027821
FACILITY_NAME
PARMAR TEXACO
STREET_NUMBER
521
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
042127456
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
521 N CHEROKEE LN LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERMIT EXTENDED TO 6/30/24 <br /> ENCROACHMENT PERMIT PERMIT NUMBER <br /> City of Lodi, CA PW2023-0199 <br /> ISSUED: 12/18/23 THRU 9> 6/30/24 <br /> PERMITTYPE: ENCROACHMENT SUBDIVISION/COMM SITE: TAX MAP NO:04127456 <br /> PERMIT SUB TYPE : UTILITY BLDG USE GROUP: <br /> JOB ADDRESS: 521 N CHEROKEE LN <br /> DESCRIPTION: Install monitoring well as per Water Quality Control Board <br /> ZONED AS: TOTAL SQFT:0 SPRINKLERS: <br /> TOTAL WORK VALUE:$0.00 TYPE OF CONSTRUCTION: BUILDING USE: <br /> APPLICANT:STEPHEN MUIR-MUIR GEOLOGY&GEOPHYSICS PHONE:(209)369-9421 <br /> MAILING ADDRESS: P.O. BOX 152 WOODBRIDGE,CA 95258 FAX: <br /> CONTRACTOR: CAL NEV GEO EXPLORATION PHONE:(916)778-0089 <br /> MAILING ADDRESS: 1079 SUNRISE AVE ROSEVILLE,CA 95661 FAX: <br /> OWNER:GARCIA,JOSE M ETAL PHONE: <br /> MAILING ADDRESS:3023 E WOODSON RD ACAMPO,CA 95220 FAX: <br /> CONTACT:STEPHEN MUIR PHONE:(209)369-9421 <br /> EMAIL ADDRESS: stevemuir@sbcglobal.net MOBILE:(209)601-6694 <br /> COMMENTS <br /> NOTIFY USA(800) 227-2600 48 HOURS PRIOR TO ANY EXCAVATION. MARKINGS MUST BE REMOVED UPON COMPLETION <br /> OF WORK. Pursuant to the provisions of the Lodi Municipal Code,the applicant applies for permission to excavate, <br /> construct, and/or otherwise encroach on City Street Right-of-Way or Easement by performing the following. WORK <br /> DESCRIPTION: <br /> CONTRACTOR to install an additional monitoring well,PT-MW 10,on the south road shoulder of MURRAY STREET, <br /> approximately 75 feet west of monitoring well PT-MW9;in a 10 inch boring to a depth of 60'bsg.Anticipate using well <br /> for approx. 1 year,when no longer needed all monitoring wells to be properly destroyed under permit.See attached— <br /> plans,directives&additional permits. <br /> **TRAFFIC CONTROL PLAN APPROVED PER ATTACHED REDLINES <br /> Sidewalk Closed"signs at work site. "Sidewalk Closed Ahead"signs at nearest crosswalks. Barricades or construction tape <br /> at work site. No storage in public right-of-way. Backfill shall be per Std Plan No.506.Asphalt concrete replacement shall <br /> be existing plus 1 inch minimum of 3 inches A.C. Match finish grades. *Landscaped and turf areas to be returned to a like <br /> or better condition. Applicant responsible for replacement of damaged plantings and sprinkler systems. *No open <br /> excavations except at time of work. Barricades required.Traffic control per California MUTCD Traffic Control Manual <br /> current issue. One-way traffic shall require flaggers. *Access to driveways and intersecting streets to be maintained. <br /> Proper notification of residents and proprietors required where applicable. <br /> Printed: Monday, December 18, 2023 <br /> 1of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.