Laserfiche WebLink
Groundwater Monitoring Well Construction Workplan <br /> February 2024 <br /> Site Locations <br /> MW-201 will be located on BBID's land, along the north side of their main intake canal from the <br /> Old River and is surrounded by farmland. There is no street address. The well will be located on <br /> parcel number 209-160-009, about 70 feet north of the center line of Bethany Road, and about <br /> 220 feet east of the intersection of Wicklund Road and Bethany Road, in Byron, California. <br /> Access to the site is secured with a gate and fencing. Figure 1 shows the location of MW-201. <br /> Mountain N�Nse� - <br /> waslewater j <br /> Treatment Facility i <br /> � I , <br /> - istan a from _ <br /> r dgi ffoot <br /> EEEEEE���-55fff ft <br /> MW-201 <br /> i <br /> ,69 ft Distance from <br /> i centerline of road <br /> a <br /> s — _Bethany Road <br /> Cr — t <br /> - a - <br /> 100 50 0 I'll <br /> San Joaquin County,CA M W-201 Location <br /> Fast _,....,...,............. I—,F <br /> Figure 1: MW-201 Monitoring Well Location <br /> MW-202 will be located on MHCSD's land, at their water treatment plant, and is adjacent to <br /> farmland and a residential development. The property street address is 18045 S. Kelso Road, <br /> parcel number 258-020-29, north of Byron Road, in Mountain House, California. The entire <br /> property is secured, and access must be requested at the main gate. Figure 2 shows the location <br /> of MW-202. <br /> GEI Consultants, Inc. 4 <br />