My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
23577
>
2900 - Site Mitigation Program
>
PR0546951
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2026 1:25:12 PM
Creation date
3/5/2026 1:13:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546951
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0015410
FACILITY_NAME
SANDHU BROTHERS FARM
STREET_NUMBER
23577
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
Zip
953049600
APN
20908026
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
23577 MOUNTAIN HOUSE PKWY TRACY 953049600
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Limited Site Investigation � Terracon <br /> Vacant Property I Tracy, California <br /> May 26, 2023 1 Terracon Project No. NA197074B <br /> 3.0 Field Investigation <br /> Terracon's field activities were conducted on June 3, 7 and 8, 2021, under oversight by a <br /> California-licensed Professional Geologist (P.G.) with Terracon. A site-specific health and <br /> safety plan was followed by Terracon during field activities for all phases of this <br /> investigation. <br /> 3.1 Pre-Mobilization Activities <br /> Terracon has a commitment to the safety of all its <br /> IT, <br /> 11P' employees. As such, and in accordance with our Incident <br /> Incident and Injury-Free and Injury Free® safety culture, Terracon developed a <br /> safety plan to be used by our personnel during field services. <br /> Prior to commencement of on-site activities, Terracon held a meeting to review health <br /> and safety needs for this specific project. Fieldwork was performed in an U.S. <br /> Occupational Safety and Health Administration (OSHA) Level D work uniform consisting <br /> of hard hats, safety glasses, protective gloves, and steel-toed boots. <br /> Pre-mobilization activities included the submission of a USA North 811 utility ticket, <br /> boring permit and Work Plan approval from the San Joaquin County - Environmental <br /> Health Department (SJC-EHD), and creation of a site-specific health and safety plan. On <br /> May 13, 2021, the soil borings were marked prior to mobilizing to the site and USA <br /> North 811 was contacted more than 72 hours prior to drilling activities by Terracon <br /> personnel for clearance of public utilities. Additionally, both Crimson Pipeline and PG&E <br /> staff met onsite to clear all proposed boring locations near the utility easement prior to <br /> the start of work. <br /> 3.2 Geophysical Survey <br /> A geophysical survey was conducted on June 3, 2021, by Ground Penetrating Radar <br /> Systems, LLC, overseen by Terracon, to assess for the potential presence or absence of <br /> buried utilities in the vicinity of the proposed soil boring locations. <br /> The geophysical survey utilized ground-penetrating radar (GPR), terrain conductivity <br /> (TC), electromagnetic (EM), and metal detector (MD) survey methods. The proposed <br /> sampling locations were adjusted in the field based on indications of utilities present in <br /> the subsurface. Changes to the proposed sampling locations was not considered <br /> significant. <br /> 3.3 Soil Borings and Soil Sampling <br /> Terracon mobilized on June 3, 7 and 8, 2021, to oversee the drilling by Penecore <br /> Drilling, Inc. of Woodland California for soil borings SB17 through SB26. Soil borings <br /> Facilities I Environmental I Geotechnical I Materials 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.