Laserfiche WebLink
Safety and Health Plan <br /> Vacant Property Tracy, California Irerracon <br /> May 21, 2021 Terracon Project No. NA197074B <br /> exhibiting the symptoms should seek medical help immediately. The best prevention against <br /> hanta virus is to eliminate or minimize contact with rodents. <br /> 10.0 ACCIDENT PREVENTION AND SAFE OPERATING PROCEDURES <br /> oo Before drilling/probing are permitted, underground utilities will be located and marked. <br /> oo The SSO will hold daily safety briefings at the beginning of each day of site activity. <br /> oo If site activities interrupt the normal flow of pedestrian or vehicular traffic, appropriate <br /> barricades will be erected around the project site. Safety orange work vests will be worn by <br /> personnel working within 10 feet of any active roadway or when vehicles or mobile equipment <br /> are present onsite. <br /> oo The SSO will ensure that unauthorized personnel do not enter the work zone. Authorized <br /> visitors will be briefed on site contaminants, personal protective equipment requirements and <br /> the decon provisions of this Plan. <br /> oo The SSO will continually inspect the work area for infractions of Health and Safety <br /> requirements contained in this plan. <br /> oo The SSO will investigate and immediately report all accidents to the Corporate Safety and <br /> Health Manager. <br /> oo Site activities will be conducted only during daylight hours unless adequate portable lighting <br /> is mobilized to the project site. <br /> oo The "buddy system" will be observed at all times during intrusive site investigations. A <br /> minimum of two people will work together and remain within eye sight or not greater than 100 <br /> ft. apart. <br /> 11.0 SITE CONTROL <br /> An exclusion zone, contaminant reduction zone and a support zone will be established whenever <br /> project activities require Level C or Level B personal protective equipment. Defined access and <br /> egress points will be established and personnel will enter only through those points. <br /> If unauthorized personnel attempt to enter the exclusion zone, the SSO will verbally inform the <br /> individual(s) to leave the project site. If unauthorized individuals refuse to leave the exclusion <br /> zone or are considered in danger or pose danger to project personnel, the SSO will cease project <br /> activities (i.e., shut down drill rigs, excavation equipment, etc.) and notify the client representative <br /> 15 <br />