My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
23577
>
2900 - Site Mitigation Program
>
PR0546951
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2026 1:25:12 PM
Creation date
3/5/2026 1:13:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546951
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0015410
FACILITY_NAME
SANDHU BROTHERS FARM
STREET_NUMBER
23577
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
Zip
953049600
APN
20908026
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
23577 MOUNTAIN HOUSE PKWY TRACY 953049600
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Safety and Health Plan <br /> Vacant Property Tracy, California Irerracon <br /> May 21, 2021 Terracon Project No. NA197074B <br /> exhibiting the symptoms should seek medical help immediately. The best prevention against <br /> hanta virus is to eliminate or minimize contact with rodents. <br /> 10.0 ACCIDENT PREVENTION AND SAFE OPERATING PROCEDURES <br /> oo Before drilling/probing are permitted, underground utilities will be located and marked. <br /> oo The SSO will hold daily safety briefings at the beginning of each day of site activity. <br /> oo If site activities interrupt the normal flow of pedestrian or vehicular traffic, appropriate <br /> barricades will be erected around the project site. Safety orange work vests will be worn by <br /> personnel working within 10 feet of any active roadway or when vehicles or mobile equipment <br /> are present onsite. <br /> oo The SSO will ensure that unauthorized personnel do not enter the work zone. Authorized <br /> visitors will be briefed on site contaminants, personal protective equipment requirements and <br /> the decon provisions of this Plan. <br /> oo The SSO will continually inspect the work area for infractions of Health and Safety <br /> requirements contained in this plan. <br /> oo The SSO will investigate and immediately report all accidents to the Corporate Safety and <br /> Health Manager. <br /> oo Site activities will be conducted only during daylight hours unless adequate portable lighting <br /> is mobilized to the project site. <br /> oo The "buddy system" will be observed at all times during intrusive site investigations. A <br /> minimum of two people will work together and remain within eye sight or not greater than 100 <br /> ft. apart. <br /> 11.0 SITE CONTROL <br /> An exclusion zone, contaminant reduction zone and a support zone will be established whenever <br /> project activities require Level C or Level B personal protective equipment. Defined access and <br /> egress points will be established and personnel will enter only through those points. <br /> If unauthorized personnel attempt to enter the exclusion zone, the SSO will verbally inform the <br /> individual(s) to leave the project site. If unauthorized individuals refuse to leave the exclusion <br /> zone or are considered in danger or pose danger to project personnel, the SSO will cease project <br /> activities (i.e., shut down drill rigs, excavation equipment, etc.) and notify the client representative <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.