My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
620
>
2300 - Underground Storage Tank Program
>
PR0231058
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2026 8:58:33 PM
Creation date
3/9/2026 9:42:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231058
PE
2361 - UST FACILITY
FACILITY_ID
FA0003738
FACILITY_NAME
CHARTER WAY SHELL*
STREET_NUMBER
620
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16504007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
620 W DR MARTIN LUTHER KING JR BLVD Stockton 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix 8.3 <br /> Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> Containment Sump and UDC Test Continuation Page <br /> CERS ID Facility Name Test Date <br /> 10181363 Charter Way Gulf 3 /3 /2026 <br /> 8. CONTAINMENT SUMP AND UDC TEST (continued) <br /> Sump/UDC ID UDC 9 & 10 UDC 11 & 12 <br /> Sump Manufacturer Bravo Bravo <br /> Sump Depth (inches) 8 " 8 " <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration B P B P <br /> inches <br /> Test Start Time 2 : 5 2 2 : 5 7 <br /> Initial Reading . 001 . 001 <br /> Test End Time 3 : 2 2 3 : 2 7 <br /> Final Reading . 001 . 001 <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria ➢ .002 ➢ .002 <br /> Tightness Test Results P a s s P a s s <br /> Continuity Test Results N A N A <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> inches <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Resu Its ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Continuity Test Results ❑Pass ❑Fail ❑Pass ❑Fai I ❑Pass ❑Fail ❑Pass ❑Fai I <br /> Describe in Section 9 all tests marked "Fail"and any repairs made during the test. <br />
The URL can be used to link to this page
Your browser does not support the video tag.