My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
1
>
1319 & 1327 S MADISON
>
0
>
2900 - Site Mitigation Program
>
PR0546597
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 10:12:07 AM
Creation date
3/12/2026 9:59:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546597
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0026437
FACILITY_NAME
ESTATE OF ANDREW J MAGNASCO SR
STREET_NUMBER
0
STREET_NAME
1319 & 1327 S MADISON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14708413
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1319 & 1327 S MADISON ST STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Health and Safety Plan <br /> 1319 & 1327 South Madison Street, Stockton, CA <br /> 432770 <br /> 4.0 GENERAL SUBSURFACE CLEARANCE REQUIREMENTS <br /> If the Tasks presented in Section 1.1 involve subsurface work, the following sections are <br /> applicable and must be followed. The Subsurface Clearance (SSC) Form (Table 5) must be <br /> completed before Site work commences. This table must be completed in its entirety. Also, all <br /> other pertinent requirements that must be met for subsurface work are identified in AEI's July <br /> 2019 SSC Policy (Appendix C) and must be followed. <br /> Table 5: Subsurface Clearance (SSC) <br /> SSC Requirement Yes No NA Comments: <br /> Prequalification of <br /> Contractor for SSC ® ❑ ❑ <br /> capability erformed <br /> "Designated Person" <br /> (e.g., AEI PM) for SSC ® ❑ ❑ <br /> work assigned <br /> Site information Facility Plans and previous <br /> Subsurface reviewed ® ❑ ❑ work completed on site by <br /> Clearance other consultants. <br /> (SSC) Site walkover including <br /> the approval of locations <br /> Document the by facility personnel and ® ❑ ❑ <br /> steps that must service notifications <br /> be followed andprovided? <br /> justify any Underground utilities Dig Safe must be <br /> exceptions. identified prior to previously notified and <br /> commencement of have cleared the site for <br /> This table intrusive activities as ® ❑ ❑ subsurface work. <br /> MUST be reasonably feasible Dig Safe Notification <br /> completed in Date:Click or tap here to <br /> its entirety. enter text. <br /> Consider/document <br /> "Critical Zones" (i.e., <br /> locations of known ® ❑ ❑ <br /> underground utilities) as <br /> reasonably feasible <br /> Will all drilling points be <br /> manually cleared if <br /> unknown hazards exist ® ❑ ❑ <br /> or slant borings be <br /> conducted? <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.