Health and Safety Plan <br /> 1319 & 1327 South Madison Street, Stockton, CA <br /> 432770 <br /> 4.0 GENERAL SUBSURFACE CLEARANCE REQUIREMENTS <br /> If the Tasks presented in Section 1.1 involve subsurface work, the following sections are <br /> applicable and must be followed. The Subsurface Clearance (SSC) Form (Table 5) must be <br /> completed before Site work commences. This table must be completed in its entirety. Also, all <br /> other pertinent requirements that must be met for subsurface work are identified in AEI's July <br /> 2019 SSC Policy (Appendix C) and must be followed. <br /> Table 5: Subsurface Clearance (SSC) <br /> SSC Requirement Yes No NA Comments: <br /> Prequalification of <br /> Contractor for SSC ® ❑ ❑ <br /> capability erformed <br /> "Designated Person" <br /> (e.g., AEI PM) for SSC ® ❑ ❑ <br /> work assigned <br /> Site information Facility Plans and previous <br /> Subsurface reviewed ® ❑ ❑ work completed on site by <br /> Clearance other consultants. <br /> (SSC) Site walkover including <br /> the approval of locations <br /> Document the by facility personnel and ® ❑ ❑ <br /> steps that must service notifications <br /> be followed andprovided? <br /> justify any Underground utilities Dig Safe must be <br /> exceptions. identified prior to previously notified and <br /> commencement of have cleared the site for <br /> This table intrusive activities as ® ❑ ❑ subsurface work. <br /> MUST be reasonably feasible Dig Safe Notification <br /> completed in Date:Click or tap here to <br /> its entirety. enter text. <br /> Consider/document <br /> "Critical Zones" (i.e., <br /> locations of known ® ❑ ❑ <br /> underground utilities) as <br /> reasonably feasible <br /> Will all drilling points be <br /> manually cleared if <br /> unknown hazards exist ® ❑ ❑ <br /> or slant borings be <br /> conducted? <br /> Page 2 <br />