|
Southwest Pond Assessment Work Plan
<br /> Lathrop Facility,San Joaquin County,California
<br /> 6.0 References
<br /> California Regional Water Quality Control Board, Central Valley Region, 2019, Order R5-2019-0010, Waste
<br /> Discharge Requirements for J.R. Simplot Company, Lathrop Facility, Class II Surface Impoundments,
<br /> Operation, Maintenance, Closure, Post-closure Maintenance, and Corrective Action, San Joaquin
<br /> County, February 8 (RWQCB, 2019a).
<br /> California Regional Water Quality Control Board, Central Valley Region, 2019, Report of Recent Inspection,
<br /> J.R. Simplot, San Joaquin County, April 22 (RWQCB, 2019b).
<br /> California Regional Water Quality Control Board, Central Valley Region, 2019, Email subject line: Simplot
<br /> Lathrop SW Pond Closure Plan, November 20 (RWQCB 2019c).
<br /> Geomatrix Consultants, Inc., 1996, Closure and Post-Closure Maintenance Plan, Class II Surface
<br /> Impoundments,J.R. Simplot Company, Lathrop, California, April 25 (Geomatrix, 1996).
<br /> Wood Environment& Infrastructure Solutions, Inc., 2019, Closure Plan—Southwest Pond, Lathrop Facility,
<br /> San Joaquin County, California, October 25 (Wood, 2019a).
<br /> Wood Environment & Infrastructure Solutions, Inc., 2019, Email subject line: Simplot Lathrop SW Pond
<br /> Closure Plan, November 22 (Wood, 2019b).
<br /> • wood.
<br />
|