Laserfiche WebLink
PROJECT: Log of Boring No. <br /> BORING LOCATION: ELEVATION AND DATUM: <br /> DRILLING CONTRACTOR: DATE STARTED: DATE FINISHED: <br /> DRILLING METHOD: <br /> TOTAL DEPTH(ft.): MEASURING POINT: <br /> DRILLING EQUIPMENT: DEPTH TO I FIRST I COMPL. 124 HRS. <br /> WATER <br /> SAMPLING METHOD: LOGGED BY: <br /> HAMMER WEIGHT: DROP: <br /> RESPONSIBLE PROFESSIONAL; REG.NO. <br /> I <br /> SAMPLES DESCRIPTION C7 <br /> a� NAME(USCS): color,moist,%by wt.,plast.density,structure, ? REMARKS <br /> Q a d cementation,react.w/HCI,geo.inter, n o Q <br /> Lu <br /> roz <br /> V) Surface Elevation: <br /> 1 <br /> 2 <br /> 3 <br /> 4 I <br /> I <br /> 5 <br /> 6 <br /> 7 <br /> I $ <br /> 9 <br /> 10 <br /> I <br /> 11 <br /> 12 <br /> 13 <br /> � 14 <br /> Wood Environment & Infrastructure Solutions, Inc. Project No. Page 1 of <br />