My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0546589
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 12:15:26 PM
Creation date
3/12/2026 12:04:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546589
PE
2965 - RWQCB LEAD AGENCY WASTE DISCHARGE SITE
FACILITY_ID
FA0026428
FACILITY_NAME
SIMPLOT LATHROP
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
16777 HOWLAND RD LATHROP 95330
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wood. <br /> PROTOCOL <br /> DRILLING AND DESTRUCTION OF SOIL BORINGS <br /> 1.0 INTRODUCTION <br /> This protocol describes the procedures to be followed during drilling and destruction of soil <br /> borings. The soil borings will provide information about geologic conditions, soil engineering <br /> properties, and/or soil quality. If the soil boring is utilized for well installation, the well will be <br /> installed in accordance with the protocol INSTALLATION OF WELLS. <br /> The procedures presented herein are intended to be of general use and may be supplemented <br /> by a work plan and/or health and safety plan. As the work progresses and if warranted, <br /> appropriate revisions may be made by the project manager. Detailed procedures in this <br /> protocol may be superseded by applicable regulatory requirements. <br /> If required, permits for drilling of soil borings will be acquired from the appropriate agency(s) <br /> before drilling is initiated, and an underground utility check will be conducted before drilling <br /> begins. An underground utility check will, at a minimum, consist of contacting a local utility <br /> alert service, if available. <br /> 2.0 DRILLING <br /> A DAILY FIELD RECORD will be completed for each day of fieldwork, and the original will be <br /> kept in the project files. <br /> The soil borings will be drilled using rotary, hollow stem auger, direct-push, or other appropriate <br /> method. In all rotary borings, compressed air will be filtered to remove oils before being <br /> circulated into the borehole. In mud rotary borings, appropriate drilling fluid additives, such as <br /> bentonite, will be used to maintain an open hole and to carry cuttings to the surface. However, <br /> organic drilling fluid additives will only be used with prior project manager approval. The drilling <br /> mud will be circulated into a settling tank or basin located near the boring. The viscosity of the <br /> drilling fluid will be assessed periodically by the driller and will be controlled throughout the <br /> drilling operation to achieve the required results (hole stability, sample return, and mud cake <br /> thickness along borehole wall). Only potable water will be used as makeup water for drilling <br /> fluid. Exploratory borings drilled using the hollow stem auger method generally do not require <br /> the use of drilling fluid. If required, potable water from a municipal supply will be used to <br /> maintain boring stability. <br /> H:\AMEC\Field Protocols\Wood Protocols\PROTO-DD 0802.doc DRILLING AND DESTRUCTION OF SOIL BORINGS <br /> REVISION DATE:February 2015 Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.