Laserfiche WebLink
1. <br />I. <br />3.4 FIELD QUALITY CONTROL <br />A. <br />B. <br />3.5 CLEANING AND PROTECTION <br />A. <br />Allow flooring system to dry a minimum of 1 week before cleaning by mechanical means.B. <br />Protect completed flooring system from damage during construction.C. <br />END OF SECTION <br />096723-7 <br />Allow flooring system to dry in accordance with manufacturer's instructions before opening to <br />traffic. <br />2. <br />3. <br />1. <br />2. <br />Manufacturer’s Services: Coordinate manufacturer’s services in accordance with <br />appropriate sections in Division 01. <br />Field Inspection. Coordinate field inspection in accordance with appropriate sections in <br />Division 01. <br />Apply cove primer and cove in accordance with manufacturer’s instructions at <br />locations indicated on the Drawings. <br />Apply cove to height and shape as indicated on the Drawings. <br />Apply cove to create seamless, smooth transition between flooring and walls. <br />Seal Coat: <br />Apply seal coat in accordance with manufacturer’s instructions. <br />Apply seal coat over traction aggregate.