My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILCOX
>
2478
>
2900 - Site Mitigation Program
>
PR0548208
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 2:45:08 PM
Creation date
3/12/2026 2:37:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548208
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0027506
FACILITY_NAME
STOCKTON PROPELLER INC.
STREET_NUMBER
2478
Direction
N
STREET_NAME
WILCOX
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10102174
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2478 N WILCOX RD STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIELD PRACTICES AND PROCEDURES <br /> General procedures used by Stratus in site assessments for drilling exploratory borings, <br /> collecting samples, and installing monitoring wells are described herein. These general <br /> procedures are used to provide consistent and reproducible results; however, some <br /> procedures may be modified based on site conditions. A California state-registered <br /> geologist supervises the following procedures. <br /> PRE-FIELD WORK ACTIVITIES <br /> Health and Safety Plan <br /> Field work performed by Stratus at the site is conducted according to guidelines established <br /> in a Site Health and Safety Plan (SHSP). The SHSP is a document which describes the <br /> hazards that may be encountered in the field and specifies protective equipment, work <br /> procedures, and emergency information. A copy of the SHSP is at the site and available <br /> for reference by appropriate parties during work at the site. <br /> Locating Underground Utilities <br /> Prior to commencement of any work that is to be below surface grade, the location of the <br /> excavation, boring, etc., is marked with white paint as required by law. An underground <br /> locating service such as Underground Service Alert (USA) is contacted. The locating <br /> company contacts the owners of the various utilities in the vicinity of the site to mark the <br /> locations of their underground utilities. Any invasive work is preceded by air knifing to a <br /> minimum depth of five feet below surface grade to avoid contact with underground <br /> utilities. <br /> FIELD METHODS AND PROCEDURES <br /> Exploratory Soil Borings <br /> Soil borings will be drilled using a truck-mounted, hollow stem auger drill rig. Soil <br /> samples for logging will be obtained from auger-return materials and by advancing a <br /> modified California split-spoon sampler equipped with brass or stainless steel liners into <br /> undisturbed soil beyond the tip of the auger. Soils will be logged by a geologist <br /> according to the Unified Soil Classification System and standard geological techniques. <br /> Drill cuttings well be screened using a portable photoionization detector (PID) or a flame <br /> ionization detector (FID). Exploratory soil borings not used for monitoring well <br /> installation will be backfilled to the surface with a bentonite-cement slurry pumped into <br /> the boring through a tremie pipe. <br /> Soil sampling equipment will be cleaned with a detergent water solution, rinsed with <br /> clean water, and equipped with clean liners between sampling intervals. Augers and <br /> samplers will be steam cleaned between each boring to reduce the possibility of cross <br />
The URL can be used to link to this page
Your browser does not support the video tag.