My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILCOX
>
2478
>
2900 - Site Mitigation Program
>
PR0548208
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 2:45:08 PM
Creation date
3/12/2026 2:37:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548208
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0027506
FACILITY_NAME
STOCKTON PROPELLER INC.
STREET_NUMBER
2478
Direction
N
STREET_NAME
WILCOX
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10102174
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2478 N WILCOX RD STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stockton Propeller Sampling and Analysis Plan <br /> List of Figures <br /> Figure 1. Site Location Map <br /> Figure 2. Site Detail Map <br /> Figure 3. Inspection and Etching Rooms Maps <br /> Figure 4. DWR Estimated Depth to Groundwater Map <br /> Figure 5. Proposed Monitoring Welling and Boring Location Map <br /> List of Tables <br /> Table 1. Brief Timeline of Stockton Propeller Inc. Investigations and Enforcement Actions <br /> Table 2. DTSC Sample Analysis Overview <br /> Table 3. Estimated Number of Wells Near the SPI Facility <br /> Table 4. Summary of GeoTracker Information for Wells in the Vicinity of the SPI Facility <br /> List of Attachments <br /> Attachment 1. Full List of Chemicals on Site at Stockton Propeller Facility (revised 09-21-2022) <br /> Attachment 2. Summary of Laboratory Analysis of Septic Tank Samples <br /> Attachment 3. DTSC Aug 2021 Sampling Report + Dec 2021 Addendum <br /> Attachment 4. CVRWQCB Responsible Party Initial Contact Letter 11-08-2021 <br /> Attachment 5. CVRWQCB Response to SPI Sampling Plan 03-25-2022 <br /> Attachment 6. CVRWQCB Order 115-2022-0806 <br /> Attachment 7. CVRWQCB Response to SPI Draft Sampling Plan 07-13-2022 <br /> Attachment 8. GeoTracker Summary Report Accessed: 03-30-2022 <br /> Attachment 9. ECHO Report Accessed: 05-09-2022 <br /> LIMITATIONS <br /> Services provided by Blankinship and Associates, Inc. in the preparation of this document were <br /> done in a manner consistent with the level of care and skill ordinarily exercised by other <br /> professional consultants under similar circumstances at the same time the services were <br /> performed. No warranty, express or implied, is included. This report is solely for Stockton <br /> Propeller Inc. use and information and any third-party use is strictly prohibited. Unless retained <br /> to do so, Blankinship &Associates is not responsible for the execution of this workplan. <br /> Blankinship&Associates, Inc. ii September 23, 2022 <br /> NES, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.