Laserfiche WebLink
Ms.Amber Ginorio,RWQCB January 30,2023 <br /> Addendum to Sampling and Analysis Plan <br /> 2478 Wilcox Road,Stockton,California <br /> Page 5 <br /> • If a grab groundwater sample cannot be obtained from boring SB-6, an additional <br /> groundwater monitoring well (MW-4) will be drilled and installed at the alternate <br /> location as shown on Figure 2. <br /> • Following installation of wells MW-1, MW-2, and MW-3, the monitoring wells <br /> and other site features will be surveyed by a California-licensed land surveyor. <br /> • Develop and sample monitoring wells MW-I, MW-2, and MW-3. <br /> For clarity and descriptive purposes, the proposed scope of work has been subdivided into <br /> four tasks, as outlined below. <br /> Task 1: Pre-field Activities <br /> Following approval of this Addendum by the RWQCB, the following activities will be <br /> completed: <br /> • Update the site-specific Health and Safety Plan. <br /> • Update drilling permits from the San Joaquin County Environmental Health <br /> Department(SJCEHD). <br /> • Confirm drilling schedule with a C-57-licensed drilling company. <br /> • Mark boring locations and contact Underground Service Alert to locate <br /> underground utilities in the vicinity of the work site. <br /> • Oversee an independent geophysicist (J R Associates) to conduct a utility survey <br /> around the proposed boring locations to identify possible subgrade utilities. <br /> • Notify the RWQCB, SJCEHD, Mr. Robert Hrabe, and Mr. Wiley Chandler of the <br /> proposed work schedule. <br /> Task 2: Field Activities <br /> Task 2A: Utility Clearance <br /> The initial five feet of all borings will be cleared using an air knife to reduce the possibility <br /> of damaging underground utilities. Drill cuttings will be containerized and stored in DOT- <br /> approved 55-gallon steel drums, and stored on-site pending proper disposal. Boring <br /> locations may be modified in the field if subgrade utilities are encountered during air <br /> knifing activities. <br /> T:\Stockton Propeller\Addendum to SAP\SM_Addendum to Sampling and Analysis Plan.docx STRATUS <br />