Laserfiche WebLink
MPEA Work Plan <br /> Martin Metals Finishing Inc. (Former) <br /> Stockton, California <br /> CDIM's work for the Fairgrounds Industrial Park was conducted under our supervision. To the best of our <br /> knowledge, the data contained herein are true and accurate, are based on what can be reasonably understood <br /> as a result of this project, and satisfy the scope of work prescribed by the client for this project. The data, findings, <br /> recommendations, specifications, or professional opinions were prepared solely for the use of the Fairgrounds <br /> Industrial Park in accordance with generally accepted processional engineering and geologic practice. We make <br /> no other warranty, either expressed or implied, and are not responsible for the interpretation by others of the <br /> contents herein. <br /> September 21 2022 <br /> Kylie Cush, PG #9936 Date <br /> Project Geologist <br /> QRpFESS/%LU C72817 September 21, 2022 <br /> * E(p 30124 Scott Bourne, PE#C72817 Date <br /> Principal Engineer <br /> q dF CAALIF <br />