My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2900 - Site Mitigation Program
>
PR0548036
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 2:59:14 PM
Creation date
3/12/2026 2:51:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548036
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027410
FACILITY_NAME
MARTIN METALS FINISHING,INC (FORMER)
STREET_NUMBER
1250
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15512007,15512014,15
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1250 S WILSON WAY STOCKTON 95205
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M CDIM Standard Operating Procedure <br /> 4.1 Soil Vapor Sampling <br /> '"°'"""'"' Rev.1 6/30/2022 <br /> • Method of sample collection <br /> • Sketch or diagram of sample location <br /> 5 HEALTH AND SAFETY <br /> All work will be performed under CDIM's Corporate Health and Safety Plan. A Project <br /> Health and Safety Plan (PHSP) will be prepared for the sampling site prior to commencement of <br /> field work. All project personnel and subcontractors at the site will review the PHSP prior to <br /> commencing work and will comply with the PHSP requirements. <br /> 6 ATTACHMENTS <br /> Attachment 1.1 — Installation and Extraction of the Vapor Pin TM SOP <br /> Attachment 1.2— Use of the Vapor Pin TPA Drilling Guide and Secure Cover SOP <br /> Attachment 2.1 —Typical Single and Nested Soil Vapor Well Construction Diagram <br /> Attachment 2.2—Soil Gas Sampling Train and Leak Detection <br /> Attachment 3.1 —Sampling Train Manifold <br /> Attachment 3.2—Shut-in Test/Purge Manifold <br /> Attachment 4—Soil Vapor Sampling Data Sheet <br /> 7 REFERENCES <br /> Alpha Analytical, 2022. EPA Method TO-15, Determination of Volatile Organic Compounds <br /> (VOCs) in Air. <br /> Department of Toxic Substances Control, 2015. Advisory Active Soil Gas Investigations. <br /> Vapor Pin Enterprises, Inc., 2021. Standard Operating Procedure: Installation and Extraction of <br /> the Vapor Pin TM Sampling Device. Plain City, Ohio. <br /> Vapor Pin Enterprises, Inc., 2021. Standard Operating Procedure: Use of the Vapor Pin TM <br /> Sampling Device Drilling Guide and Secure Cover. Plain City, Ohio. <br /> Vapor Pin TM, 2020. "Vapor PinTm Live Demo Including Leak Testing". YouTube, Vapor Pin Live <br /> Demo Including Leak Testing (water dam, mechanical and helium) - YouTube. Dated 23 <br /> September. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.