My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2900 - Site Mitigation Program
>
PR0548036
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 2:59:14 PM
Creation date
3/12/2026 2:51:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548036
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027410
FACILITY_NAME
MARTIN METALS FINISHING,INC (FORMER)
STREET_NUMBER
1250
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15512007,15512014,15
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1250 S WILSON WAY STOCKTON 95205
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Standard Operating Procedure <br /> Installation and Removal of the Vapor Pin® Sampling Device <br /> Updated January 28, 2021 <br /> Page 2 <br /> 2) Set up wet/dry vacuum to collect drill 6) Remove the bit and drilling guide, clean <br /> cuttings. the hole, and install the VAPOR PIN® <br /> sampling device in accordance with the <br /> 3) While wearing PPE, drill a 11/2-inch SOP "Installation and Extraction of the <br /> diameter hole into the concrete slab to a VAPOR PIN® sampling device. <br /> depth of approximately 1 3/4 inches. <br /> Pre-marking the desired depth on the drill ti _ <br /> bit with tape will assist in this process. <br /> 4) Remove cuttings from the hole and place W" <br /> the Drilling Guide in the hole with the °r <br /> conical end down (Figure 3). The hole is <br /> sufficiently deep if the flange of the <br /> Drilling Guide lies flush with the surface <br /> of the slab. Deepen the hole as <br /> necessary, but avoid drilling more than Figure 4. Using the Drilling Guide <br /> 2 inches into the slab, as the threads on <br /> the Secure Cover may not engage 7) Screw the Secure Cover onto the VAPOR <br /> properly with the threads on the VAPOR PIN® sampling device and tighten using a <br /> P1N® sampling device. #14 spanner wrench by rotating it <br /> clockwise (Figure 5). Rotate the cover <br /> `l'!R counter clockwise to remove it for <br /> subsequent access. <br /> ",7 <br /> Figure 3. Testing Depth with the Drilling <br /> Guide <br /> 5) When the 1 1/2-inch diameter hole is Figure 5. Tightening the Secured Cover <br /> drilled to the proper depth, replace the Limitations: <br /> drill bit with a 5/8-inch diameter bit, <br /> insert the bit through the Drilling Guide On slabs less than 3 inches thick, it may be <br /> (Figure 4), and drill through the slab. The difficult to obtain a good seal in a flush <br /> Drilling Guide will help to center the hole mount configuration with the VAPOR PIN® <br /> for the VAPOR PIN® sampling device, and sampling device. <br /> keep the hole perpendicular to the slab. <br /> Vapor NO sampling device protected under US Patent#8,220,347 B2 <br /> Vapor Pin Enterprises, Inc.•7750 Corporate Blvd.,Plain City,Ohio 43064•(614)504-6915•https://www.vgpoipin.com/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.