My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2900 - Site Mitigation Program
>
PR0548036
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 2:59:14 PM
Creation date
3/12/2026 2:51:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548036
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027410
FACILITY_NAME
MARTIN METALS FINISHING,INC (FORMER)
STREET_NUMBER
1250
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15512007,15512014,15
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1250 S WILSON WAY STOCKTON 95205
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g. <br /> �M Appendix A. Responsiveness Summary <br /> Martin Metals Finishing Inc. (Former) <br /> Stockton, California <br /> Response to Department of Toxic Substances Control (DTSC) Comments for CDIM's Preliminary <br /> Endangerment Assessment (PEA) and Supplemental Site Investigation (SSI)Work Plan (Work Plan), <br /> Martin Metal Finishing Inc. Stockton California, dated July 25, 2022. <br /> Comment Response <br /> MMF-SS-07 through MMF-SS-09. These PEA and SSI Work Plan. <br /> borings could ultimately reduce the number <br /> of future step-out locations. <br /> • The addition of one soil boring adjacent One boring, MMF-SS-11, was added just <br /> (preferably just downgradient)to the downgradient of the old stormwater outfall, <br /> presumed location of the"old stormwater and one boring, MMF-SS-08, was added <br /> outfall" and one soil boring adjacent to the adjacent to the central portion of the storm <br /> storm drain leading from the MMF building drain (Figure 5). Soil samples will be collected <br /> to Mormon Slough (in between the storm from 5, 10, and 15 feet below ground surface <br /> drain inlet and boring MMF-SS-05). Soil (ft bgs) and analyzed for metals, hexavalent <br /> samples should be collected from these chromium, soil pH, and volatile organic <br /> borings at the same depth intervals as compounds (VOCs) as described in text. <br /> MMF-SS-03 through MMF-SS-06 and be <br /> submitted for the same laboratory analyses <br /> as well. <br /> • The GSB recommends the addition of three Three soil borings were added to the scope of <br /> soil borings inside the former MMF building. work inside the MMF building: MMF-SS-03 at <br /> These borings should be located in the the former sludge drying and storage area, <br /> former sludge drying and storage area, the MMF-SS-05 at the former plating area, and <br /> former plating area, and the center of the MMF-SS-04 in the center of the building <br /> building. Soil samples should be collected (Figure 5). Soil samples will be collected from <br /> from these boring at the same depth 5, 10, and 15 ft bgs and analyzed for metals, <br /> intervals as MMF-SS-01 and MMF-SS-02 hexavalent chromium, soil pH, and VOCs as <br /> and be submitted for the same laboratory described in text. <br /> analyses as well. <br /> • The GSB recommends the collection of soil In Figure 5 and text Section 3.4, CDIM has <br /> vapor samples in addition to sub-slab vapor. proposed finishing the five borings located <br /> The GSB suggests that the five interior soil inside the MMF building as dual-nested soil <br /> borings be competed as dual-nested soil gas wells (MMF-SV-01 through MMF-SV-05) <br /> vapor probes, with implants placed at 5 and with probes set at 5 and 15 ft bgs. Four <br /> 15 feet bgs. Following installation, these soil additional dual-nested soil vapor probes are <br /> vapor probes should be sampled in proposed north of the MMF building in the <br /> accordance with the DTSC's 2015 Advisory- vicinity of the storm drain and former Site <br /> Active Soil Gas Investigations (the operations to assist with delineation of <br /> Advisory). The collected soil vapor samples constituents detected in soil vapor within the <br /> should be submitted for laboratory analysis building. All soil vapor samples will be <br /> of VOCs. The GSB further recommends that analyzed for VOCs, oxygen, and helium as <br /> CDIM consider the installation and sampling described in text Section 3.5—Laboratory <br /> of between two and four exterior soil vapor Analysis. Sampling protocols are described in <br /> probes. Based on the overall size of this the QA/QC Plan. <br /> scope of work, installing and sampling these <br /> probes may prove beneficial in delineating <br /> any potential impacts to soil vapor. <br /> Page A-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.