My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARCH
>
0
>
2900 - Site Mitigation Program
>
PR0548331
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 9:35:34 AM
Creation date
3/13/2026 9:31:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548331
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0027589
FACILITY_NAME
BNSF STOCKTON INTERMODAL FACILITY
STREET_NUMBER
0
STREET_NAME
ARCH
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
18117007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
ARCH RD STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ - <br /> r , r <br /> �a <br /> /C/_x 1) STRIP TRACK 303 RAMP INFRASTRUCTURE t + 4 ' `' _ • ' <br /> C 7,340' STRIP LENGTH * <br /> EST. CONST - $11 .1 M (2022) ip laz.4 '� ,• <br /> CURRENT DESIGN LEVEL - 95% <br /> SUBGRADE COMPLETED (2016) �' <br /> 2-MONTH DESIGN & BID <br /> 5-MONTH CONSTRUCTION �" - •G r <br /> IMPORT 8,690 CY - <br /> z 2) STORAGE TRACK 202 <br /> FROM PROPOSED <br /> 9,950 STORAGE TRACK (CLEAR) _ <br /> CHASSIS PARKING p �� EST. CONST - $4.75M (2023) <br /> LOT (PROJECT #3) , <br /> Y CURRENT DESIGN LEVEL - 90% <br /> C 1-MONTH DESIGN <br /> 2-MONTH CONSTRUCTION (BNSF FORCES ONLY) <br /> i <br /> 7) MAINTENANCE WYE TRACK , `• ___ _- - <br /> EST. CONST - $7.8M (2023) 3) TRACK 302 & 301 BARE TABLE STORAGE <br /> CURRENT DESIGN LEVEL - 95% 9,540' STORAGE TRACK 302 (CLEAR) <br /> 2-MONTH DESIGN & BID C 9,540' STORAGE TRACK 301 (CLEAR) <br /> 5-MONTH CONSTRUCTION EST. CONST - $13.5M (2023) ' <br /> CURRENT DESIGN LEVEL - 100% <br /> ARCH SUBGRADE COMPLETED (2016) <br /> 2-MONTH DESIGN _ - <br /> 3-MONTH CONSTRUCTION (BNSF FORCES ONLY) <br /> ,,, <br /> r3A) TRACK 302 & 301 AREA HIGH MAST LIGHTING <br /> A = IMPORT 43,885 CY - - <br /> FROM PROPOSED " SOT \ EST. CONST - $4.5M (2023) _ <br /> > CHASSIS PARKING TELECOM - $1 .25M (2023) <br /> LOT (PROJECT #3) CURRENT DESIGN LEVEL - 95% <br /> HAM CONDUITS INSTALLED (2017) <br /> • BURN w 00 <br /> 2-MONTH DESIGN <br /> lowOT 3-MONTH CONSTRUCTION <br /> 6) PARKING LOT EXPANSION , <br /> FLEX STACKING/WHEELED PARKING <br /> 2,634 STACKING STALLS <br /> 8 TO 958 TRAILER PARKING STALLS , <br /> EST. CONST - $38.3M 2023 <br /> CURRENT DESIGN LEVEL - 90% <br /> 2-MONTH DESIGN & BID 3 <br /> �i, 7-MONTH CONSTRUCTION <br /> t <br /> OT <br /> 4 L <br /> 3 <br /> N - _ 40 <br /> r <br /> EXPORT 52,575 CY <br /> Lu, '`ram —�`�� TO PARKING LOT <br /> y - EXPANSION <br /> SUBGRADE OF ALL <br /> (PROJECT #6) <br /> o <br /> . . . PROJECT LOCATION WILL <br /> M; �' �' � �•��,. - - � BE CEMENT TREATED SOIL <br /> p i T <br /> 5) PARKING LOT 4/5 CONVERSION C,q �Fe <br /> . ;:t =` • 79 ADDITIONAL TRAILER PARKING STALLS <br /> EST. CONST - $120,000 (2023) � <br /> ' '� • •�' CURRENT DESIGN LEVEL - 95% <br /> 2-MONTH DESIGN & BID <br /> U <br /> OPTION A - TRACK 302 RAMP INFRASTRUCTURE 1-MONTH CONSTRUCTION <br /> 7,310' STRIP LENGTH _ <br /> " EST. CONST $11 .5M (2023) <br /> 4) CHASSIS PARKING LOT <br /> 3-MONTH DESIGN & BID <br /> 5-MONTH CONSTRUCTION , 620 CHASSIS PARKING STALLS <br /> EST. CONST - $5.8M (2023) GRAVEL SURFACE. `• �- <br /> OPTION B- TRACK 301 RAMP INFRASTRUCTURE _ EST. CONST - $11.3M (2023) ASPHALT �Qa � .-••. <br /> 7 310' STRIP LENGTH <br /> SURFACE <br /> Z CURRENT DESIGN LEVEL - 90% <br /> EST. CONST $21 .6M (2023) <br /> Y 6-MONTH DESIGN & BID 2-MONTH DESIGN & BID 0 200 40- <br /> 7-MONTH CONSTRUCTION 3-MONTH CONSTRUCTION <br /> w SCALE IN FEET <br /> BNSF APPROVALS - (NAME - TITLE) DATE BNSF APPROVALS - (NAME - TITLE) DATE CAD F 0 R N A D V D 0 N <br /> SM <br /> CTOCKTON CUBS V D 0 <br /> D H E SEGMENT 2200 RAAZWAY <br /> REVISIONS STOCK TON R TER M OD AD RAC D TY <br /> N0. DESCRIPTION DATE BY C C D S C H E M A T C <br /> IL <br /> N FUTURE PROJECTS <br /> N <br /> O <br /> N <br /> W <br /> N PROTRAK SEQ NO STATUS <br /> /� <br /> Lu DRAWN KCL CHECKED JGC B C D R R A D VV1nI /� �/ <br /> C 0 M R A �l Y D Dl C Dl D D R �l O O D R V C D SPREL/M/NARY � ISSUED FOR REVIEW 7-26-22 KCL FILE: Stockton_Exhibit_1 _072222.dwg SHEET 1 OF 1 DATE: 12/28/2022 <br /> ° <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.