Laserfiche WebLink
• Mark each proposed wall location with while paint and provide a minimum of 48-hour notice to <br /> the local public milidic; via Underground Service Alert prior to commencement of the well <br /> destructions as required by law. <br /> • Retain the services of Penacore Drilling (Permanent), a G57 licensed hollow-stem maker drilling <br /> connector to perform the well destruction activities. <br /> Task 2 - Field Activities <br /> Permanent will de arty three 4-inchdianm(cr monitoring Wells (M W-I through M107-3Z two 4-inch-diameter <br /> extraction walk; ( IX-1 and GWX-I), tan 2imhediamctcr monitoring Wells (MWd through MW-13), <br /> simmer 2-inchdimmfer sparks wells (AS7 Though AS22) and three 2-irnehdiamas observation Wells <br /> (VM-1 thmugh VIA-3) using a hollow-slew auger drilling rig W destroy each well pa' WCE13D guidelines. _ <br /> The;cell construction derails are included in Table 1. As "tneacd by the CNRWQCB, a summary ofthe <br /> meet rerea groundwater analyr al resulN Cr each well is included in Tables 2 and 3, and loy fs weak of <br /> the Wells W he destmix! arc allached. SideeArt brings log were gerrented for wells M" throng AS22, <br /> wt will provide copies of California Dxpmlmenl of Walr Rewurecs Well Completion Reform for these <br /> wells m the SICEI ID. <br /> The 34 walls Will be narrowed by drilling out the entim contents of wear wall(casing fi bar pack and wonder <br /> seal) using a hollow-sfsr wage drilling rig equipped With a vast plug "stinger" bit. Penecom will use B- <br /> and 10-inchdiamaer augers to drill our tiro itigutive 2- and 4ineM1diamYr polyvinyl chloride (PVC) <br /> walls. Ona wit love combined! that the auMrslmve reached the tried depth of malt met] (ranging fiam "W <br /> 120E b Pencerewill dislMge the wood plug"stings" bit from the billow of Oro augers and lwchdillthe <br /> boring with neat Portland cement grant heard), Ihey Wvill continue to backfll the hiring and remove angers <br /> Wind tine gout level stabilises at a depth ofappuxinrateiy 3 bad. They will backfill do remaining 3 fat of <br /> each boring with either gout, wind, or used caning; from the drill cuts. Pescara will than cap each boring at <br /> the surfs with appoxdw(ety 6 inches of either conerem or mil cuttings deporting an ti¢ surrounding <br /> gsaJ surf. <br /> We will destroy the borrmrfl Moment piping that connected the manediution wells to the firemer <br /> nanediation systems by filling than with grout We will and wear reuredial piping con a its wellhead and <br /> munch a90n PVC alone, with approximately 0.5E ofwrlical PVC pipe. We will dmnn pro gout into the <br /> opposite and of the prying in the firmea system transient compound, omit gout is obxrvN a the <br /> wellhead. Wewill than glue PVC slip sP%onrobah ends ofthe piping,sealing in degrees. <br /> Task 3 - Waste Disposal <br /> The caning numerical fimn the destruction of wells that have historically had late in an contaminates <br /> deemed in their soil and groundwater counties (MW4 through MW-13) will be shokpided unite pending <br /> profiling. One four-part compreim ompk will be obtained from the stockpile and analyml for tool <br /> licoutum hydrocarbons as gasoline under Trailed States Environmental Prreation Agency (EPA) lest <br /> Melted 8015M, hemenc, arduener, mhylbaneere, total xytencs, and me0ryl tert-bulyh ether under EPA 'hat <br /> Method 8260B, and total lead under 6010B. no results ofthese andyses will be povided to the EICEI ID <br /> and(handing their approval), tiro clean mil Wvrll be spread across(M1c surlha of llne S tic <br /> The cuttings ganaakd during die distraction ofWalis MW-f though MW-3, AS-] Turner AS22,mid VM- <br /> I through V will be contained in a plamic-lined, 20cubinyad birtq perdmg waste acrep wtme and <br /> disposed. The Wall casings and other mixellmeous nrlMasNws debris will either be placed in a wane <br /> tceeptaolaer moyded <br /> C•w..wyWd W. wtewbp -2 Fdnwy w,2013 <br />