Laserfiche WebLink
Mr. Marty Hartzell Project 8MR6 <br /> July20, 2001 <br /> Page 2 <br /> Evaluation ofhydrauHc bead differences observed between the well pairs will be used to <br /> calculate vertical gunboats. <br /> As restuddol in the June 27, 2001 letter, an east-west cross-section June MW-7 to CPT-3 has <br /> hem constructed showing lithology, depth discrete groundwater concentrations and the <br /> proposed annealing well screm intervals. The location ofthe doss-section is shown an <br /> Figure 2. Cross-section A-A' is shown on Figure 3. <br /> Permitting <br /> Monitoring well pemdis will be obtained from the San Joaquin County Department of Health <br /> Services, Envlmnmmtal Health Division (SICEIID). be addition, an encroachmnd pound <br /> will be obtained been the City ofSlockton for the wells to be located in Shanahan; Street. <br /> Access fen wells located an private property will be negotiated with the property owner. <br /> Monitoring Well Installation <br /> Six groundwater monitoring wells (MW-9 through MW-13) will be installed at the general <br /> locations shown on Figure 1. The wells will be installed as well pairs each sousued at <br /> riQ t zones identified in the CPT invertigatim Three of the proposed wdls (MW-8, 10 <br /> and 12) will be drilled to 90 feet bgs and will he s aremel from 60 to 70 fee[ has. Three of the <br /> proposed wells (MW-9, 11 and 13) will be installed to 90f bits and will be screened Gom <br /> 80 to 90 fed has. <br /> The soil borings will be drilled using 8-inch hollow-stem auger drilling cluipmmt. ALL down- <br /> hole drilling and sampling equipment will be steam-cleaned following the completion of the <br /> withering. All wmkwill be done in accordance with stipulations of pmnits obtained Eon <br /> the SICEIID. <br /> Gronedwater mouitorng was will be completed by installing 2-inch diameter, Rush- <br /> threaded, Schedule 40 PVC casing with 0.020 inch factory-sloaed sender. AnRMCL12 <br /> sand pack, or equivalent, will be placed in the annular space across the entire screened <br /> interval, mdwillextmdapproxi ely2f abovethetopoftbesere theweE. A <br /> 2 to 3 foot bentonite transition seal will las placed atop the send pack, and a Portland cement <br /> seal will extend from the bemonAc transition seal to the ®owd surface. The Portland cement <br /> seal will be emplaced by Prude pipe or fl ou9b the tern¢ of the hollow-stem angers in one <br /> nrownmrv. =p�wel:i..wovonum.mxomi.m ++'coaPolNTlory <br /> ry�wmeo) <br />