My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
601
>
2900 - Site Mitigation Program
>
PR0506054
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 1:49:40 PM
Creation date
3/13/2026 1:27:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506054
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0007173
FACILITY_NAME
FORMER VINTAGE CARWASH (VACANT LOT)
STREET_NUMBER
601
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
13931025
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
601 E MINER AVE STOCKTON 95202
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Marty Hartzell P ject 803026 <br /> December 13, 2000 <br /> Page 4 <br /> Based on the above evaluations IT will prepare a workplan proposing additional <br /> groundwater monitoring well m adequately monitor the water-bearing zone. IT will <br /> select the number, location and depths of additional monitoring wells by considering a <br /> number of factors, including the following: <br /> • Recent groundwater quality datn farm the ongoing mordtoring and reporting <br /> Program: <br /> • Geological and chemical dam collected during the CPTMydraPunch <br /> investigation; and <br /> • Hydrogeologic data collected during previous investigations <br /> SCHEDULE <br /> IT is prepared m initiate work on this project immediately following written approval of <br /> the work plan by the RWQCB. "Ile tentative schedule for comple ing the grourWwatar <br /> venigation is shown on Figure 2. IT will have or obtain access to two of the proposed <br /> CPTs that are barred on private property. IT will work with the DGS-RESD to chain <br /> ancess epleemenm. IT anticipates that acquiring off-site access m perform CPT and <br /> Hydropunch work on adjacent properties may be a fairly lengthy process. Therefore, we <br /> stress the fact that this schedule is tentative. If will notify the RWQCB in writing of <br /> any delays In the schedule. <br /> Ifyou have any questions or require additional information please do not hesitate to call <br /> us at (916) 928-3300. <br /> Sincerely, <br /> IT CORPORATION <br /> To S� Lath <br /> Project Engineer Sewor Project Managtr <br /> Attachments: Figure I — Site Plan <br /> Figure 2 —Proposed Schedule <br /> cc. Michael Golden, DGS-R D <br /> Michael Infume% San Joaquin County Envirm memal Health Division - Stockton <br />
The URL can be used to link to this page
Your browser does not support the video tag.