Laserfiche WebLink
1 1 <br /> Mr. Many Hartzell Project 8030M <br /> September 8, 2000 <br /> Page 8 <br /> IT is prepared to coordinate and complete the air sparge test, and install proposed <br /> monitoring well MW-8, as soon as agency approval is obtained. If you have any <br /> questions or comments, please call us at (916) 928-3300. <br /> Sincerely, <br /> IT CORPORATION <br /> Sincerely, <br /> IT CORPORATION .. <br /> T�A1 S thfi <br /> Project Senior lhojectMmager <br /> Attachments: Tablet Summary of Water lxvels, Thickness of Floating Product, <br /> and Fuel Related Analytical Data <br /> Tablet Groundwater Sampling Schedule <br /> F gene l Site Plan <br /> Figure2 Proposed Well I.ocalimw <br /> Appendix Exploratory poring and Well translation Procedures <br /> cc. Michael Goldw, DGS RESD <br /> San 3osquin County Department of Public Health <br /> I/IMPUMR0r1 <br /> mo�s�ewrsw�..sayQuvrrmvwcaao<mr:� <br /> Na�m000) <br />