Laserfiche WebLink
January 2021 <br /> Project No. 20-6274 AdvancedGeo <br /> Page 2 of 7 An Employee-Owned Company <br /> 3.0. ON-SITE CONTROL <br /> The Site Safety Officer will coordinate site access control and security. An exclusion <br /> zone will be established approximately 20 feet around excavation location work areas. <br /> No unauthorized person shall be allowed within this exclusion area. <br /> 4.0. HAZARD EVALUATION <br /> The following substance(s) or hazards are known or suspected to be on site. <br /> F__SUBSTANCES INVOLVED: CONCENTRATIONS: <br /> II <br /> ADDITIONAL POTENTIAL HAZARDS INCLUDE: <br /> SLIP-TRIP-FALL NOISE <br /> HEAVY EQUIPMENT VIBRATION HAZARDS <br /> TRAFFIC HAZARDS <br /> 5.0. PERSONAL PROTECTIVE EQUIPMENT <br /> Based on evaluation of potential hazards, the following levels of personal protection <br /> have been designated for the applicable work areas or task: <br /> LOCATION: JOB FUNCTION: LEVELS OF PROTECTION: <br /> EXCLUSION ZONE EXCAVATION AREA A B C D Other <br /> REDUCTION ZONE PRESERVE SAMPLES A B C D Other <br /> SUPPORT ZONE SUPPORT FUNCTIONS A B C D 0ther <br />