Laserfiche WebLink
Ground Zero Analysis, Inc. <br /> HEALTH AND SAFETY PLAN <br /> Off-site communications: ❑ Radio X Telephone ❑ Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: Location as determined by On Site Safety Officer and marked on site map daily <br /> MARK EVACUATION ROUTE(S) ON SITE MAP O CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: <br /> Location of Wash Water: At Site <br /> Location of Toilet: At Site <br /> Location of Drinking Water: Brought to Site <br /> Equipment Decontamination Procedure: Equipment will be washed with an Alconox® solution and/or <br /> steam cleaned. <br /> Materials to be disposed of as Waste: All soil and groundwater generated during the scope of work <br /> will be stored in a DOT approved 55-gallon steel drum until a <br /> disposal profile is completed. <br /> PAGE <br />