My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
300
>
2900 - Site Mitigation Program
>
PR0544892
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 4:34:58 PM
Creation date
3/16/2026 4:20:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544892
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0025521
FACILITY_NAME
OLIVAREZ PROPERTY
STREET_NUMBER
300
Direction
S
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14909001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
300 S CALIFORNIA ST STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tylor McMillan's Well Service <br /> 9530 Hageman Rd. STE B#349 Bakersfield CA,93312 <br /> Phone: (916)761-5224 Email:tylor@wellblaster.com <br /> Website:www.wellblaster.com <br /> Date: January 30,2024 <br /> BLASTING WORK PLAN <br /> Well:MW2 Location:300 South California St. Plan date and time: Pending <br /> Casing 2-inch ID PVC to 60 feet Stockton,CA <br /> 4 Sealing pipe Boosters <br /> GL Density g/cc 1.55 g/cc <br /> Detonation Velocity 24,000 ft/s 7,315 m/s <br /> Casing Diameter 2 inches <br /> 10, Detonator placed at 10 feet Charge Wt. 0.15 Kg 150 grams <br /> Detonation pressure 207 k/bar <br /> Total energy ea. 13,997 k/bar <br /> 20 Pressure at casing 3,341.48 k/bar 50,018,545 psi <br /> Pressure at 10 feet 0.00 29 psi <br /> 30' Explosive Cord <br /> Density g/cc 1.60 g/cc <br /> Detonation Velocity 22,000 ft/s 6,706 m/s <br /> 40' Detonating Cord Casing Diameter 2 inches <br /> Start 10 feet Grains 25 gr/ft 1.62 g/ft <br /> Intervals Linear <br /> End 60 feet Detonation pressure 180 k/bar <br /> 50' Strength 25 grain Total energy pef ft. 11 k/bar <br /> Total 50 feet Pressure at casing 3.48 k/bar 52,062 psi <br /> *These are estimated pressure for a empty well <br /> 60' Site procedure <br /> 1. Check site and measure well depth <br /> 2. Clear work site of all unessential personal <br /> 3. Lower charges and drop pipe into the well <br /> 70' 4. Pump sealing material to top of well <br /> 5. Check and clear blast area(sound blast warning) <br /> 6. Arm explosives <br /> 7. Confirm area clear(final blast warning) <br /> 80, 8. Detonate charge <br /> 9. Check hole and sound all clear <br /> 10. Refill cement to top of well to form a mushroom cap <br /> 90, <br /> Name of Blaster Preparing Plan: Tylor McMillan <br /> 100' Total los Expives <br /> .1los *Tylor McMillan's Well Service reserves the right to change or modify the charge in <br /> any way necessary to maintain the safety of all personnel onsite and in surrounding <br /> areas. <br /> 110, <br /> 120' <br /> 130' <br /> 150' <br />
The URL can be used to link to this page
Your browser does not support the video tag.