|
n-q7p
<br /> `s
<br /> DEL-TECH GEOTECHNICAL SUPPORT,INC.
<br /> FORWARD LANDFILL
<br /> SUMP FIELD SUMMARY LOG 2026
<br /> DATE 1/31/26 2/7/26 2/10/26 2/21/26 2/28/26
<br /> DgrrnroweraE JUMPTHRMHOLD.TOTALDEPTH D.T.W. D.T.W. TOTAL D.T.W. TOTAL D.T.W. TOTAL D.T.W. TOTAL D.T.W. TOTAL
<br /> UNrr LOCATION
<br /> FU-03 63' 94' 73 73 73 72 72
<br /> Totalizer Meter 480,500 481,100 600 481,400 300 482,900 1,500 484,800 1,900
<br /> FUa63
<br /> LYStkgTER :81 81 81 81- • 81
<br /> ANY DEFICIENCIES OBSERVED? NO NO NO NO NO
<br /> FU-04 W 65' 100, 82 80 81 78 79
<br /> Totalizer Meter 986,000 088,900 2,900 990,400 1,500 997,50.0 7,100 1,005,500 8,000
<br /> FU-04W
<br /> LYSIMETER 102 102- -102 102 - 102
<br /> ANY DEFICIENCIES OBSERVED? NO NO NO NO NO
<br /> FU-04 E 62' 93' 75 74 74 74 74
<br /> Totalizer Meter 512100 55,200 4,100 57,300 2,100 63,700 6,400 73,600 92900
<br /> FO-04E.,
<br /> LYSIMETE.R - 80 80 80 8.0: �80. _..
<br /> ANY DEFICIENCIES OBSERVED? NO NO NO NO NO
<br /> FU-05 65' 100, 114 114 114 114 114
<br /> Totalizer Meter 1,793,100 .1,796,500 3,400 1,798,300 1,800 1,802,300 4,000 1,811,700 9,400
<br /> FU-05
<br /> LYsIME• g NiA N/A. NIA X/A N/A
<br /> ANY DEFICIENCIES OBSERVED? NO NO NO NO NO
<br /> FU-06 67' 99, 82 82 82 81 80
<br /> Totalizer Meter 2,429,800 2,429,800 0 2,429,900 100 2,430,000 100 2,430,100 100
<br /> FU-06
<br /> LYsik TER REPAIRS REPAIRS REPAIRS REPAIRS REPAIRS
<br /> ANY DEFICIENCIES OBSERVED? NO NO NO NO NO
<br /> FU-19W ?? 81 81 81 81 81
<br /> Totalizer Meter 482,900 484,100 1,200 484,400 300 486,400 2,000 487,500 1,100
<br /> ru-SECONDARY SUMP N/A N/A N/A N/A N/A'
<br /> ANY DEFICIENCIES OBSERVED? NO NO NO NO NO
<br /> FU-19E ?? 87 118 118 118 86
<br /> Totalizer Meter 238,500 241,600 3,100 242,500 900 243,900 1,400 243,900 0
<br /> SECONDARY 114. 116. 116.- 116 116,'.:.
<br /> ANY DEFICIENCIES OBSERVED? NO NO NO NO NO
<br /> F-WEST POND ?? 93' 102 101 101 101 101
<br /> Totalizer Meter 10,900 10,900 0 10,900 0 10,900 0 10,900 0
<br /> ANY DEFICIENCIES OBSERVED? NO NO NO NO NO
<br /> TOTAL 15,300 1 7,000 1 21,000 28,500 0
<br /> NOTES- AMOUNT PURGED IS CALCULATED USING TOTALIZER METER READINGS. ANY DEFICIENCIES OBSERVED WILL BE
<br /> '-'-'NOTED AND REPORTED TO REPUBLIC.
<br />
|