Laserfiche WebLink
Brendan Kenny <br /> Central Valley Regional Water Quality Control Board <br /> April 15, 2026 <br /> hours and a total downtime of 1 hour in March 2026. Flare FL-100 recorded a maximum adjusted flow rate of <br /> 3,793 scfm. <br /> • Flare FL-150 had a total runtime of 741.33 hours and a total downtime of 2.67 hours in January 2026, a total <br /> runtime of 671.4 hours and downtime of 0.6 hours in February 2026, and a total run of 743 hours and a total <br /> downtime of 1 hour in March 2026. Flare FL-150 recorded a maximum adjusted flow rate of 3,219 scfm. <br /> Geosyntec's First Quarter 2026 Corrective Action Program Update concluded that the data collected by SCS <br /> during the reporting period met the CAO requirements for the operation and maintenance of the landfill GCCS. <br /> Closing <br /> Arcadis will continue to monitor the Site's GWTS, the residential GWTSs, and the facility's landfill GCCS. Program <br /> updates will be submitted to the Water Board by the required due dates. <br /> If you have any questions or need additional information, please contact Dalia Rumani at 626-991-7597. <br /> Sincerely, <br /> Arcadis U.S., Inc. <br /> R4 Eft'` <br /> C$2a42 <br /> CIY1� t' <br /> Dalia Rumani William Semel, PE � �` <br /> Project Manager Principal Engineer <br /> California Professional Engineer#C-82542 <br /> CC. Osvaldo Cordero, Forward, Inc. <br /> Enclosures: <br /> Attachment 1 Groundwater Treatment System Monitoring Logs <br /> Attachment 2 Quarterly Correction Action Program Update—Landfill Gas Collection and Control <br /> System <br /> www.arcadis.com 4/4 <br /> Forward Landfill IQ26 CAP Update_04.15.2026 <br />