Laserfiche WebLink
C+E L-T E I-- DEL-TECH GEOTECHNICAL SUPPORT........,_....-- E:: ....,.,. ,INC. <br /> '- 209 232-7967 OFFICE cassandra deltech1.com EMAIL <br /> FORWARD LANDFILL <br /> 9999 S AUSTIN ROAD/MANTECA, CA. <br /> MONITORING WELL FIELD SUMMARY LOG 2026 <br /> DEPTH TO WATER MEASUREMENTS <br /> SAMPLER: DEL-TECH-ANTONIO MORALES/MANUEL MORENO METER#: HERON DIPPER T2-1078 <br /> IST.QUARTER I TOTAL <br /> LOCATION DATE MONUMENT TIME D.T.W I TIME D.T.W. I DEPTH <br /> BASELINE I SECONDARY <br /> AMW-22S 2/6/2026 POST 8:20 59.00 8:20 59.00 86.90' <br /> AMW-22 2/6/2026 POST 8:19 59.14 8:19 59.14 142.25' <br /> AMW-23S 1/27/2026 POST 14:10 66.10 14:10 66.10 87.60' <br /> AMW-23M 1/27/2026 POST 14:12 66.50 14:12 66.50 174.40' <br /> AMW-23D 1/27/2026 POST 14:14 67.70 14:14 67.70 244.55' <br /> AMW-24SR 1/27/2026 POST 14:44 73.00 14:44 73.00 118.40' <br /> AMW-24R 1/27/2026 POST 14:45 73.40 14:45 73.40 180.10, <br /> AMW-25 1/27/2026 POST 14:50 73.10 14:50 73.10 159.25' <br /> AMW-26R 1/27/2026 POST 15:00 64.95 15:00 1 64.95 174.00' <br /> AMW-28 2/5/2026 POST 6:51 58.04 6:52 58.04 184.50' <br /> AMW-29S 1/27/2026 FLUSH 15:26 69.90 15:26 69.90 116.45' <br /> AMW-29 1/27/2026 FLUSH 15:28 70.00 15:28 70.00 162.19' <br /> AMW-30S 1/27/2026 FLUSH 15:32 74.85 15:32 74.85 124.00' <br /> AMW-30 1/27/2026 FLUSH 15:34 74.80 15:34 74.80 176.50' <br /> AMW-31S 1/27/2026 POST 13:31 57.90 13:31 57.90 117.60' <br /> AMW-31 1/27/2026 POST 13:29 57.95 13:29 57.95 144.30' <br /> AMW-32S 1/27/2026 POST 12:38 54.65 12:38 54.65 127.30' <br /> AMW-32 1/27/2026 POST 12:40 54.70 12:40 54.70 152.58' <br /> AMW-33S 1/27/2026 FLUSH 16:42 58.35 16:42 58.35 84.00' <br /> AMW-33 1/27/2026 FLUSH 16:40 58.15 16:40 58.15 177.65' <br /> AMW-34S 1/27/2026 FLUSH 16:01 66.32 16:01 66.32 80.00' <br /> AMW-34M 1/27/2026 FLUSH 16:03 67.12 16:03 67.12 183.44' <br /> AMW-34 1/27/2026 FLUSH 16:05 72.15 16:05 72.15 409.60' <br /> AMW-35S 1/27/2026 FLUSH 16:19 88.15 16:19 88.15 105.00' <br /> AMW-35 1/27/2026 FLUSH 16:22 88.00 16:22 88.00 165.00' <br /> AMW-36S 1/27/2026 FLUSH 17:08 50.45 17:08 50.45 85.00' <br /> AMW-36 1/27/2026 FLUSH 17:10 50.15 17:10 50.15 194.50' <br /> AMW-37S 1/27/2026 POST 12:51 53.45 12:51 53.45 87.64' <br /> AMW-37 1/27/2026 POST 12:53 53.10 12:53 53.10 187.41' <br /> AMW-38S 1/27/2026 POST 10:31 54.03 10:32 54.03 97.93' <br /> AMW-39S 2/2/2026 POST 14:20 55.15 14:21 55.15 91.09, <br /> AMW-40S 1/27/2026 POST 12:45 54.20 12:46 54.20 73.28' <br /> AMW-40M 1/27/2026 POST 12:47 54.15 12:48 54.15 123.00' <br /> AMW-41S 1/27/2026 POST 12:57 55.50 12:58 55.50 78.11' <br /> AMW-41M 1/27/2026 POST 12:59 55.70 12:59 55.70 119.35' <br /> AMW-42S 1/27/2026 POST 13:03 57.70 13:04 57.70 83.02' <br /> AMW-42M 1/27/2026 POST 13:05 57.75 13:05 57.75 112.75' <br /> AMW-43S 1/27/2026 POST 13:09 56.65 13:09 56.65 83.04' <br /> AMW-43M 1/27/2026 POST 13:11 56.65 13:12 56.65 112.98' <br /> ALL MEASUREMENTS ARE MADE FROM THE NORTH SIDE AND TOP EDGE OF THE WELL CASING. THE TOP OF CASING IS MARKED WITH A NOTCH OR PERMANENT MARKER, <br /> WHICH EVER ONE CONDITION IS APPROPRIATE. <br /> PAGE 2OF3 <br />