Laserfiche WebLink
Attachments <br />30703 MacArthur Tracy Materials & T.S. 3-11-2026 photolog <br />Page 2 of 2 <br />4. Dust was minimal at the time of inspection. Processing building is equipped with misting <br />system. <br />6. Onsite personnel directing traffic in the parking area. Multiple traffic signs are posted <br />throughout the facility. <br />7. Reviewed log of special occurrences, load check records, daily tonnage and vehicle counts, <br />and training records. No safety training has occurred for this month yet per compliance <br />manager. <br />8. The food processing unit is not in use. The operator will notify the LEA when the operator <br />plans to operate the food processing unit. <br />9. The operator has not begun the Phase 2 expansion to the north side Material Recovery <br />Facility. The operator will notify the LEA when the operator plans to begin the Phase 2 <br />addition. <br />CalRecycle Solid Waste Information System (SWIS) <br />Date Generated: March 24, 2026 11:15 AM <br />5. Two spotters observed inside the transfer station building with personal protective <br />equipment. <br />Transfer/Processing Facility Inspection Report (53) <br />Tracy Material Recovery & T.S. (39-AA-0024) <br />3/11/2026