Laserfiche WebLink
<br />North County Recycling Center & Sanitary Landfill Department of Public Works/Solid Waste <br />First Semiannual 2025 Groundwater Monitoring Report ©2025 COUNTY of San Joaquin. All Rights Reserved <br /> 21 <br />11 FACILITY MONITORING <br />County staff inspects the landfill and its associated facilities for any needed maintenance and <br />repair, to ensure that all facilities are functioning properly. The facility monitoring program for the <br />NCRC&SL includes routine maintenance, storm response, and site winterization. <br />11.1 Routine Maintenance <br />The County performs maintenance at the NCRC&SL, repairing minor damage, such as erosion <br />rills and ponding of water on an as-needed basis. Maintenance monitoring is typically performed, <br />unless there is a need for more frequent maintenance. Maintenance needs are recorded and <br />scheduled for repair as soon as possible. <br />11.2 Storm Response <br />There was no need for storm response during the first semiannual 2025 period. <br />11.3 Site Winterization. <br />The County prepares a site winterization plan on an annual basis to assist the landfill in <br />responding to winter conditions. <br />Per the winterization plan, the drainage and erosion control measures are installed. <br />