My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 2/11/26
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
COMPLIANCE INFO_JTD 2/11/26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 10:17:41 AM
Creation date
3/24/2026 4:20:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 2/11/26
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1799
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2010-0016 -11- SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS NORTH COUNTY LANDFILL SAN JOAQUIN COUNTY <br /> <br /> 45. Module 1’s LCRS included perforated HDPE collection pipe (3-inch laterals and 6-inch headers) in gravel-filled troughs overlying the blanket layer of filter fabric/geonet. The foundation layer was graded at a 1.4% cross slope toward a leachate collection sump on the western side of the module. The system was plumbed for gravity drainage to the sump, which was constructed with a single composite liner. The sump was installed with a manually operated pump and no automatic flow recordation. The sump was plumbed to a 3,000 gallon above ground storage tank (AGT) in the southwest corner of the module. <br />To ensure compliance with Discharge Specification B.5, Facility Specification C.4 requires that all manually operated LCRS sumps, including Module 1’s, be upgraded to the automatic controls specified for new modules in Construction Specification D.2.d. Provision G.8.a requires that the Discharger submit a work plan and schedule for implementing these upgrades. . 46. The interface between Modules 1 and 3 consisted of an anchor trench/berm approximately 3 feet in height. <br />Module 3 47. Module 3 was constructed in 1995 with a Subtitle D-compliant, engineered alternative design (EAD) to the Title 27 prescriptive standard for an MSW landfill, approved under previous WDRs (Order No. 95-068), as follows, from top to bottom: <br />Component Base Liner Side Slopes Operations Layer ≥ 2’ soil Filter Fabric Geotextile1 LCRS Geonet 60-mil HDPE2 Base Liner GCL 80-mil HDPE2 <br />Foundation Layer ≥ 6” compacted soil ____________________________ 1. 10 oz/yd2 non-woven fabric. 2. HDPE single-side textured, placed smooth side up. Module 3’s LCRS was the same basic design as Module 4’s (See Construction Specification D.2), but with a manually operated sump pump. Also, the collection sump for Module 3 was plumbed to the same AGT as Module 1. As with Module 1, Facility Specification C.4 requires that Module 3 sump be upgraded to the automatic controls specified for new modules in Construction Specification D.2.d, while Provision G.8.a requires submission of a work plan and schedule for implementing the required upgrade.
The URL can be used to link to this page
Your browser does not support the video tag.