My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 2/11/26
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
COMPLIANCE INFO_JTD 2/11/26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 10:17:41 AM
Creation date
3/24/2026 4:20:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 2/11/26
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1799
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2010-0016 -40- SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS NORTH COUNTY LANDFILL SAN JOAQUIN COUNTY <br /> <br /> nature and extent of the release. c. A discussion of corrective action needs and options. d. Proposed additional corrective action measures, as necessary. e. A plan to monitor the progress of corrective action measures consistent with the MRP. f. Cost estimates for implementing additional corrective action, including monitoring. g. An implementation schedule. <br />8. Consistent with required facility monitoring under MRP Section B, the Discharger shall investigate the following monitoring facilities and, by <br />31 March 2010, submit a facility status report that includes the items identified below: <br />a. LCRS Sumps <br />1) A report describing current condition and operational controls. <br />2) A work plan and schedule for upgrading manually operated sumps (i.e., Modules 1 and 3), as necessary, to comply with Facility Specification C.4 of this Order. <br />b. Lysimeters <br />1) A report as to condition and operational status, including, but not limited to, those lysimeters typically reported as dry (e.g., VZs-1 through -3). <br />2) A work plan and schedule for repair or replacement of any lysimeter found not to be in good working order. <br />c. Monitoring Well G-2 <br />1) A report as to condition and operational status, including monitoring history of the well. <br />2) A work plan and schedule for repair or replacement of the well, as necessary. 9. By 30 April 2010, the Discharger shall submit for approval an updated preliminary closure and postclosure maintenance plan (PCPMP) to reflect current operations (including vertical expansion plans, if approved by LEA) and requirements under these WDRs, including MRP No. R5-2010-0016. The PCMP shall meet the requirements of Title 27 Section 21769(b) applicable to an active landfill. The updated plan shall include updated third party cost estimates for the following items, as necessary: <br />a. Landfill closure (e.g., grading, installation of cover) <br />b. Postclosure Maintenance (e.g., cover repairs, facility maintenance,
The URL can be used to link to this page
Your browser does not support the video tag.