My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 2/11/26
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
COMPLIANCE INFO_JTD 2/11/26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 10:17:41 AM
Creation date
3/24/2026 4:20:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 2/11/26
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1799
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Non-Water Release Corrective Action Plan <br />North County Recycling Center and Sanitary Landfill <br />AU24.1294.00 | Non-Water Release Corrective Action Plan Update i <br />October 2024 <br />TABLE OF CONTENTS <br />1.0 INTRODUCTION .......................................................................................................... 1 <br />1.1 Background ............................................................................................................. 1 <br />2.0 GEOLOGIC AND HYDROGEOLOGIC OVERVIEW ............................................................ 1 <br />2.1 Site Geology and Hydrogeology .............................................................................. 1 <br />2.2 Surface Water Hydrology ........................................................................................ 2 <br />3.0 LANDFILL CONFIGURATION ........................................................................................ 3 <br />3.1 Landfill Gas Migration Monitoring and Control System ......................................... 3 <br />3.2 Groundwater Monitoring System ........................................................................... 3 <br />3.3 Surface Water Controls ........................................................................................... 3 <br />4.0 REASONABLY FORESEEABLE NON-WATER IMPACTS .................................................... 3 <br />4.1 Seismically-Induced Impacts ................................................................................... 4 <br />4.1.1 Impacts from Ground Rupture .................................................................... 6 <br />4.1.2 Impacts from Seiches .................................................................................. 6 <br />4.1.3 Impacts from Tsunamis ............................................................................... 6 <br />4.1.4 Impacts from Liquefaction and Associated Dynamic Settlement............... 6 <br />4.1.5 Impacts from Potential Slope Failure ......................................................... 7 <br />4.1.6 Summary of Impacts from Seismic Hazards ............................................. 10 <br />4.2 Precipitation Impacts ............................................................................................ 10 <br />4.3 Fire Impacts ........................................................................................................... 11 <br />4.3.1 Subsurface Fires ........................................................................................ 11 <br />4.3.2 Wildfires .................................................................................................... 12 <br />4.4 Flooding Impacts ................................................................................................... 12 <br />4.5 Non-Seismic Long-Term Performance .................................................................. 13 <br />4.5.1 Final Cover System .................................................................................... 13 <br />5.0 ANTICIPATED METHODS OF MITIGATION .................................................................. 14 <br />5.1 Mitigation of Seismically-Induced Impacts ........................................................... 14 <br />5.3 Mitigation of Fire-Related Impacts ....................................................................... 14 <br />5.3.1 Subsurface Fires ........................................................................................ 14 <br />5.3.2 Wildfires .................................................................................................... 15 <br />5.4 Mitigation of Flood-Related Impacts .................................................................... 15 <br />6.0 ESTIMATED NON-WATER RELEASE MITIGATION COST ESTIMATE SUMMARY ............. 15 <br />7.0 LIMITATIONS ............................................................................................................ 15 <br />8.0 REFERENCES ............................................................................................................. 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.