My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 2/11/26
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
COMPLIANCE INFO_JTD 2/11/26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 10:17:41 AM
Creation date
3/24/2026 4:20:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 2/11/26
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1799
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM NO. R5-2010-0016 -12- SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS NORTH COUNTY LANDFILL SAN JOAQUIN COUNTY <br /> <br /> <br /> <br />Sampling Point Sampling Location Source of Flow Type <br />SW-11 Representative upstream location Runon or direct rainfall Runon SW-2 Outfall to eastern perimeter ditch ISB Runoff <br />SW-32 Outfall to South Paddy Creek - Upstream Eastern Perimeter Ditch Runoff <br />SW-4 Outfall to South Paddy Creek - Down stream Western Perimeter Ditch Runoff <br />SW-53 SW Outfall to natural drain Western Perimeter Ditch Runoff <br />SW-63 SW Outfall to natural drain Southern perimeter ditch Runoff <br />__________________________________ 1. SW-1 may be any upstream location in the storm water drainage system representative of background storm water conditions. 2. No sampling required at this monitoring point if at time of sampling only source of flow is that from SW-2. 3. Future discharge locations. <br />The results of storm water monitoring for these constituents shall be summarized in the monitoring reports submitted under this Order. If there is no discharge from the site during the monitoring period, or the Discharger did not obtain samples of the discharge, the Discharger shall state the reasons and circumstances in the monitoring report. 2. Surface Water Surface water sampling shall be collected at upstream monitoring point S-1 and down stream monitoring point S-2, as shown on Attachment B: Site Map. Monitoring shall be conducted for the parameters and constituents, and at the corresponding frequencies, listed in Table F.3.c, except for Redox potential, which need not be monitored. Creek elevation may be estimated based on observation. <br />H. REPORTING <br />1. Records The Discharger shall retain records of all monitoring information, including all calibration and maintenance records, all original strip chart recordings of continuous monitoring instrumentation, copies of all reports required by this Order, and records of all data used to complete the application for this Order. Records shall be maintained throughout the life of the facility including the postclosure period. Such legible records shall show the following for each sample:
The URL can be used to link to this page
Your browser does not support the video tag.