Laserfiche WebLink
North County Recycling Center and Sanitary Landfill <br />Non-Water Release Corrective Action Plan <br />October, 2024 <br />Item Description <br />1 MOBILIZATION/DEMOBILIZATION <br />2 SUBGRADE PREPARATION <br />3 BENCH AND PERIMETER CHANNEL RECONSTRUCTION <br />4 EROSION CONTROL <br />5 CONTRACTOR PER DIEM (INCLUDES TRAVEL)1 <br />6 CONTRACTOR PROFIT AND OVERHEAD (15%)2 <br />SUBTOTAL <br />CONTINGENCY @20% <br />TOTAL NON-WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />Notes: <br />1 Per diem of $206 per 8 hour shift, based on GSA rates for Lodi, California. <br />2 Based on 15% of total Contractor construction work costs. <br />4,944.00$ <br />13,265.82$ <br />Total <br />Cost <br />32,913.00$ <br />18,422.80$ <br />32,874.89$ <br />4,228.08$ <br />PRECIPITATION IMPACTS <br />TABLE D-1 - NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL - SAN JOAQUIN COUNTY <br />NON-WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />106,648.58$ <br />21,329.72$ <br />127,978.30$ <br />4 of 5