My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 2/11/26
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
COMPLIANCE INFO_JTD 2/11/26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 10:17:41 AM
Creation date
3/24/2026 4:20:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 2/11/26
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1799
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Preliminary Closure and Postclosure Maintenance Plan 2-1 Department of Public Works/Solid Waste <br />North County Recycling Center and Sanitary Landfill County of San Joaquin Public Works/Solid Waste –October 30, 2024 <br />1.0 Introduction <br />1.1 Purpose <br />The purpose of the Preliminary Closure and Postclosure Maintenance Plan (PC/PMP) is to provide a basis for closure costs and fulfill related requirements in accordance with California Code of Regulations [CCR] Title 27. <br />1.2 Background <br />This Plan follows guidelines recommended by the California Department of Resources Recycling and Recovery (CalRecycle - formerly the California Integrated Waste Management Board) to assess reasonableness of cost estimates Title 27, Section 21790(a)). This document supersedes the Preliminary Closure and Postclosure Maintenance Plan for the North County <br />Recycling Center and Sanitary Landfill, dated November 25, 2019. <br />Basis for this Plan includes the 30 Percent Design Report for Vertical Expansion of the <br />North County Recycling Center and Sanitary Landfill (Shaw Environmental, Inc., 2007). Excerpts of that report are included in this document as appropriate. <br />1.3 Regulatory Requirements <br />The requirements for a PCPMP are contained in Title 27, CCR. Throughout this document, where section numbers of regulations are cited, they refer to Title 27 CCR. In general, this PCPMP is consistent with Title 27 CCR, Chapter 4, Subchapter 4, Development of <br />Closure/Post-Closure Maintenance Plans, and Title 27, Chapter 3, Subchapter 5, Article 2, <br />Closure and Postclosure Maintenance Standards for Disposal Sites and Landfill. Selected landfill facility construction standards are currently regulated by Title 27 CCR, Chapter 3, Subchapter 2 titled Siting and Design and Article 4 of the same chapter and subchapter titled <br />State Water Resource Control Board - Waste Management Unit Construction Standards. The following provides a list of requirements outlined in Chapter 4, Subchapter 4, for use in the preparation and format of a PC/PMP: <br />• 21770(d) CIWMB – Scope and Applicability, (1), (2), and (3) <br />• 21790 CIWMB – Preliminary Closure Plan Contents (b) (1) through (8), <br />• 21820 CIWMB – Closure Cost Estimates (a) through (c) <br />• 21825 CIWMB – Preliminary Postclosure Maintenance Plan Contents (b) <br />• 21840 CIWMB – Postclosure Maintenance Cost Estimates (a) (b)
The URL can be used to link to this page
Your browser does not support the video tag.