My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 2/11/26
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
COMPLIANCE INFO_JTD 2/11/26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 10:17:41 AM
Creation date
3/24/2026 4:20:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 2/11/26
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1799
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North County Recycling Center and Sanitary Landfill <br />Storm Water Pollution Prevention Plan <br /> <br /> <br /> <br />Page 11 <br />5.0 List of Industrial Materials <br />The following is a list of significant industrial materials stored and used at the North County <br />Landfill. This list is subject to change and will be reviewed and revised as a part of the annual <br />evaluation: <br />Table 5.0 - List of Industrial Materials <br />Significant Material <br />Location where materials <br />are stored, handled, <br />received, or shipped Quantities/Frequency <br />Antifreeze Maintenance shop area 1 to 2 55-gallon drums <br />Detergents Maintenance shop area 55-gallon drum (1 gallon per month) <br />Diesel fuel Main building / fueling Area 6,000 gallons <br />Diesel fuel Diesel fuel tank in fire pump <br />house <br />200 gallons <br />Domestic wastewater On-site septic system and <br />portable toilets <br />Quantities vary <br />Inert materials Materials may be recycled or <br />used on site for cover and site <br />construction purposes. Soil is <br />also excavated from <br />designated on-site borrow <br />areas for daily cover. <br />Inert material used at the site <br />annually is estimated at 4,900 tons <br />per year. <br />Cover soil excavated from the on- <br />site borrow area is estimated at 68 <br />tons per day. <br />Leachate Collected from all modules, <br />returned to Subtitle D-lined <br />modules only. <br />Approximately 300,000 gallons of <br />leachate is recirculated into the <br />landfill to be absorbed by dryer <br />refuse. <br />Lead acid batteries MRF. Approximately 8 tons annually. <br />Load check materials <br />and household <br />hazardous waste <br />Initially stored in <br />appropriately contained areas <br />within the recycling center <br />building under a roof. <br />Material is categorized and <br />moved to hazardous material <br />and waste containment <br />cabinets located at bone yard. <br />Approximately 44 tons annually. <br />Paint West wall of the recycling <br />center under a roof. <br />Approximately 15,075 gallons of <br />paint are stored and sold annually. <br />Recyclable materials Recycling center building 1,000 tons per month <br />Solid waste Landfill and recycling center <br />bldg. and Module 5 <br />500 – 1200 tons per day <br />Green waste Green waste area 300 tons per month
The URL can be used to link to this page
Your browser does not support the video tag.