My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 2/11/26
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
COMPLIANCE INFO_JTD 2/11/26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 10:17:41 AM
Creation date
3/24/2026 4:20:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 2/11/26
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1799
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North County Recycling Center and Sanitary Landfill <br />Storm Water Pollution Prevention Plan <br /> <br /> <br /> <br />Page 64 <br />D. For influent not meeting MCLs, the facility will need to pretreat the infiltration <br />BMP or BMPs influent 17 to comply with the State Water Board’s Division of <br />Drinking Water MCLs referenced in General Permit Attachment I, Table A. <br />Figure 13.1.1.2 <br />Table A: Applicable Constituents with Primary or Secondary MCLs <br />Parameter Category MCL Criteria for Industrial Pollutant Pretreatment11 <br />Primary MCLs: <br />• Primary MCLs: Inorganics <br />• Primary MCLs: Volatile Organic <br />Carbon (VOCs) <br />• Primary MCLs: Synthetic Organic <br />Contaminants (SOCs) <br />• Primary MCLs: Disinfection <br />Byproducts <br />see the “California Drinking Water-Related Laws” webpage <br />(https://www.waterboards.ca.gov/drinking_water/certlic/drinkingwater/ <br />Lawbook.html) <br />Secondary MCLs: Total Dissolved <br />Solids Pollutants associated with industrial activities in the influent of the <br />infiltration BMP(s) shall not exceed 500 mg/L. <br />Secondary MCLs: Chloride Pollutants associated with industrial activities in the influent of the <br />infiltration BMP(s) shall not exceed 250 mg/L. <br />Secondary MCLs: Specific <br />Conductance Pollutants associated with industrial activities in the influent of the <br />infiltration BMP(s) shall not exceed 900 uS/cm. <br />Secondary MCLs for Sulfate Pollutants associated with industrial activities in the influent of the <br />infiltration BMP(s) shall not exceed 250 mg/L. <br />* If the applicable Regional Water Board’s Basin Plan contains different water quality objectives for groundwater, <br />the Basin Plan water quality objectives supersede as a pretreatment limit. <br />13.1.2 Onsite Compliance Option Implementation Schedule <br />13.1.2.1 Baseline Status <br />A facility with Baseline Status for all pollutants July 1, 2020 or on July 1 of the monitoring <br />and reporting year intending to implement the on-site compliance option will need to notify <br />the SWRCB or the RWQCB (Water Boards) via SMARTS no later than three (3) months prior <br />to the estimated date of the BMP or BMPs installation and operation or prior to obtaining <br />applicable local approvals for the BMP or BMPs, whichever comes first. The facility shall <br />submit the required implementation information and schedule in the facility’s SWPPP in <br />accordance with General Permit Attachment I, Section II.H.3. <br />13.1.2.2 Level 1 Status <br />A facility with Level 1 Status as of July 1, 2020 or on July 1 of the monitoring and reporting <br />year intending to implement the on-site compliance option must submit the implementation <br />information required in General Permit Attachment I. Section II in their Level 1 ERA <br />Evaluation and Report, per the required schedule in General Permit Section XII.C or prior to <br />obtaining applicable local approvals for the BMP or BMPs, whichever comes first. <br /> <br />17 see Attachment I, Section II.E.6 Footnote #’s 10
The URL can be used to link to this page
Your browser does not support the video tag.