My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 2/11/26
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
COMPLIANCE INFO_JTD 2/11/26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 10:17:41 AM
Creation date
3/24/2026 4:20:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 2/11/26
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
标签
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1799
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North County Recycling Center and Sanitary Landfill <br />Storm Water Pollution Prevention Plan <br /> <br /> <br /> <br />Page 66 <br />1. Monitoring (sampling and analysis) results for the infiltrated water, if applicable. <br />2. Monitoring (sampling and analysis) results of influent entering the BMP or BMPs. <br />3. The size of each rain event, in inches of rain per hour, that discharges from the BMP <br />or BMPs: <br />4. The estimated volume of the corresponding discharge; and, <br />5. The date and estimated start and end time of all discharges. <br />13.1.4.3 SWPPP Requirements <br />A facility complying with the on-site compliance option shall update their SWPPP with the <br />following documentation: <br />1. Description and photographs of the facility specific on-site BMP or BMPs. <br />2. Operation and maintenance plan certified by the California licensed civil engineer that <br />includes, but is not limited to, the following items: 1) inspection frequency; 2) titles of <br />personnel authorized to conduct the BMP or BMPs inspections; 3) maintenance <br />procedures for BMP or BMPs and installed pretreatment; and, 4) a maintenance <br />schedule; <br />3. BMP or BMPs safety factor and reliability calculations required in General Permit <br />Attachment I, Section II.E.3. <br />4. Certification required in General Permit Attachment I, Section II.C provided by the <br />California licensed civil engineer; and, <br />5. Applicable information on any preexisting contamination in the soil or groundwater for <br />any industrial or non-industrial pollutants at the facility that may be discharged or <br />mobilized through infiltration to meet the protections in General Permit Attachment I, <br />Section IV. <br />The updated SWPPP shall be available at the facility and submitted on SMARTS 7 days prior <br />to the initial operation of the BMP or BMPs. Also, the SWPPP at a minimum, needs to include <br />the BMP or BMPs design information from General Permit Attachment I, Section II.E and the <br />design information for any installed pretreatment systems/devices. <br />
The URL can be used to link to this page
Your browser does not support the video tag.