Laserfiche WebLink
Underground Storage Tank <br />Overfill Prevention Equipment Inspection Report <br />G. OVERFILL PREVENTION EQUIPMENT DETAILS <br />Tank ID (one OPE per colurnn) <br />87 <br />91 <br />nsL <br />Are both vent and tank riser piping <br />f <br />Yes <br />f <br />I Yes <br />f <br />Yes <br />Yes <br />secondarily contained? <br />Na <br />No <br />No <br />7No <br />OPE Model <br />OPW 7190 <br />OPW 71so <br />OPW 71sa <br />What is the OPE response when activated? <br />f Shut off <br />f Shut off <br />f <br />Shut off <br />Shut off <br />(Check all that apply.) <br />Flow <br />Flow <br />Flow <br />Flow <br />Restricts <br />Restricts <br />7Restricts. <br />Restricts <br />Flow <br />Flow <br />Flow <br />Flow <br />Audible <br />Audible <br />Audible <br />Audible <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />Visual <br />Visual <br />Visual <br />Visual <br />Alarm <br />Yes* <br />Alarm <br />Yes* <br />Alarm <br />Alarm <br />Are flow restrictors installed on vent piping <br />Yes* <br />Yes* <br />that may interfere with the OPE operation? <br />f Na <br />7,/ No <br />No <br />No <br />f <br />At what level in the tank is the OPE set to <br />activate? (Inches from bottom of tank)_103 <br />3/4" <br />104 1./4" <br />102" <br />What is the percent capacity of the tank at <br />which the OPE activates? <br />92.59 <br />93.465 <br />90.83 <br />Is the OPE in proper operating condition to <br />f Yes <br />f Yes <br />f <br />Yes <br />Yes <br />respond when the stored substance <br />No <br />No <br />No <br />No <br />reaches the designated regulatory level? <br />7. SUMMARY OF TESTING RESULTS <br />f <br />Pass <br />f Pass <br />f <br />Pass <br />Pass <br />OPE Inspection Results <br />Fail <br />Fail <br />Fail <br />Fail <br />8. COMMENTS <br />Describe alt results marked "Fail' and each proposed remedy. <br />* Mark here if: <br />Flow restrictors interfere with overfill prevention and equipment repairs required. <br />Additional copies of this page may be attached. <br />Attach tank chart(s), measurements, calculations, and In -Tank Setup report(s) <br />Page 2 of 2 <br />