My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9036
>
2300 - Underground Storage Tank Program
>
PR2500477
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 8:29:57 PM
Creation date
3/25/2026 8:26:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR2500477
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004289
FACILITY_NAME
ARCO 07193
STREET_NUMBER
9036
STREET_NAME
THORNTON
STREET_TYPE
RD
City
Stockton
Zip
95209
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
9036 THORNTON RD Stockton 95209
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix B <br />n(�L 71 SO Overfill Valve in Tank Initial Shut off Level Worksheet <br />Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br />manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisd-rc- <br />tion (AHJ) and review local, state, and national codes to determine the regulatory requirements governing <br />shut-off capacity in your region, as well as take into account other considerations such as extreme tank tilt. <br />Take the following measurements with the valve In- <br />stalled in the tank: <br />Distance from the 71 SO inlet tube flange to the cast <br />lug in the 71 SO body (see figures), upper tube length. <br />Note: the UpperTube Length must be at least 16'to in- <br />clude the protective bend in the tube. <br />(o) _ �0 q '7' <br />Distance from the 71 SO inlet tube flange to the top and <br />bottom of lower tube, valve length. <br />(W) = '� U - — <br />M= Ikin . <br />Distance from the 71 SO inlet tube flange to the bottom <br />of the tank- Note: If a tank bottom protector is present it <br />may be necessary to add this thickness to dimension <br />(OPW 6111 & 61 TP models add 0.601) <br />(B)= 1_-) 1. `-;D <br />From the tank calibration chart provided by tank manu- <br />facturer find the dipstick number (Y) which corresponds <br />to the 100% volume. <br />(Y) = l % <br />1. To determine shut-off percentage: <br />Subtract upper tube length (D) from distance to tank <br />bottom (B) <br />(x) = (B) — (o) - 2"' <br />Using the tank calibration chart provided by the tank <br />manufacturer determine the tank capacity at the cal- <br />culated (X) dimension and the 100% volume (Y) tank <br />capacity. <br />(x} tank capacity in gallons = <br />(Y) tank capacity in gallons <br />S0% = (x) capacity 1(Y) capacity x100 = �( .?0 <br />i� <br />(D) I€ <br />Upper <br />Tube <br />I <br />(W) Valve <br />Length, <br />bottom of l <br />cut I <br />(B) <br />To Tank <br />(yl ! <br />Tank <br />[U] Valve Chart <br />Length, 100% <br />top of cut Volume r <br />Dipstick <br />f <br />Note: The overfill valve must be installed per AHJ require- <br />ments and all applicable local, state, and national codes. If <br />the overfill valve is set above the allowable shut-off percent- <br />age the overfill valve must be removed and replaced. For <br />reference 40 CFR part 280 Subpart B Section 280.20 overfill <br />valves should be set to a maximum of 95%. <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.