Laserfiche WebLink
Appendix B <br />n(�L 71 SO Overfill Valve in Tank Initial Shut off Level Worksheet <br />Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br />manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisd-rc- <br />tion (AHJ) and review local, state, and national codes to determine the regulatory requirements governing <br />shut-off capacity in your region, as well as take into account other considerations such as extreme tank tilt. <br />Take the following measurements with the valve In- <br />stalled in the tank: <br />Distance from the 71 SO inlet tube flange to the cast <br />lug in the 71 SO body (see figures), upper tube length. <br />Note: the UpperTube Length must be at least 16'to in- <br />clude the protective bend in the tube. <br />(o) _ �0 q '7' <br />Distance from the 71 SO inlet tube flange to the top and <br />bottom of lower tube, valve length. <br />(W) = '� U - — <br />M= Ikin . <br />Distance from the 71 SO inlet tube flange to the bottom <br />of the tank- Note: If a tank bottom protector is present it <br />may be necessary to add this thickness to dimension <br />(OPW 6111 & 61 TP models add 0.601) <br />(B)= 1_-) 1. `-;D <br />From the tank calibration chart provided by tank manu- <br />facturer find the dipstick number (Y) which corresponds <br />to the 100% volume. <br />(Y) = l % <br />1. To determine shut-off percentage: <br />Subtract upper tube length (D) from distance to tank <br />bottom (B) <br />(x) = (B) — (o) - 2"' <br />Using the tank calibration chart provided by the tank <br />manufacturer determine the tank capacity at the cal- <br />culated (X) dimension and the 100% volume (Y) tank <br />capacity. <br />(x} tank capacity in gallons = <br />(Y) tank capacity in gallons <br />S0% = (x) capacity 1(Y) capacity x100 = �( .?0 <br />i� <br />(D) I€ <br />Upper <br />Tube <br />I <br />(W) Valve <br />Length, <br />bottom of l <br />cut I <br />(B) <br />To Tank <br />(yl ! <br />Tank <br />[U] Valve Chart <br />Length, 100% <br />top of cut Volume r <br />Dipstick <br />f <br />Note: The overfill valve must be installed per AHJ require- <br />ments and all applicable local, state, and national codes. If <br />the overfill valve is set above the allowable shut-off percent- <br />age the overfill valve must be removed and replaced. For <br />reference 40 CFR part 280 Subpart B Section 280.20 overfill <br />valves should be set to a maximum of 95%. <br />21 <br />