My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2026 11:15:25 AM
Creation date
4/3/2026 11:12:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231059
PE
2361 - UST FACILITY
FACILITY_ID
FA0002512
FACILITY_NAME
EXPRESS FUEL & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
701 E DR MARTIN LUTHER KING JR BLVD STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />8. SUMP/UDC' TEST (continued) <br />Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />Test Type ❑ Pressure ❑Vacuum ❑Hydrostatic <br />Test Equipment Used: <br />Sump/UDC ID <br />Sump Manufacturer <br />Sump/UDC ID <br />Sump Depth (inches) <br />Sump Manufacturer <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Sump Depth (inches) <br />Test Start Time <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Initial Reading <br />Test Start Time <br />Test End Time <br />Initial Reading <br />Change in Reading <br />Test End Time <br />Pass/Fail Criteria <br />Final Reading <br />Tightness Test Results <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Change in Reading <br />❑ Pass ❑ Fail <br />Pass/Fail Criteria <br />Tightness Test Results <br />❑Pass ❑Fail <br />❑Pass ❑Fail <br />❑Pass ❑Fail <br />❑Pass ❑Fail <br />Additional copies of this page maybe attached. <br />All tests marked "Fail" and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 4 of 5 <br />Sump/UDC ID <br />Sump Manufacturer <br />Sump Depth (inches) <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Additional copies of this page maybe attached. <br />All tests marked "Fail" and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.