My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1856
>
2300 - Underground Storage Tank Program
>
PR0231069
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2026 11:34:34 AM
Creation date
4/3/2026 11:29:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231069
PE
2361 - UST FACILITY
FACILITY_ID
FA0001909
FACILITY_NAME
STOP N SHOP
STREET_NUMBER
1856
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12319102
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1856 W COUNTRY CLUB BLVD STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. CONTAINMENT SUMP AND UDC TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard x Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum X Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> ❑ Check this box if Appendix 8.3 continuation page is attached. <br /> Sump/UDC ID 1-Regular 87-PS 2-Super 91-PS <br /> Sump Manufacturer XERXES XERXES <br /> Sump Depth (inches) <br /> 40" 35" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 14" 15" <br /> (inches) <br /> Test Start Time 12:22 12:27 <br /> Initial Reading .001 .001 <br /> Test End Time 12:52 12:57 <br /> Final Reading .001 .001 <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria .002 ➢ .002 <br /> Tightness Test Results P a s s P a s s <br /> Continuity Test Results NA NA <br /> Sump/UDC ID UDC 1&2 UDC 3&4 <br /> Sump Manufacturer Bravo Bravo <br /> Sump Depth (inches) <br /> 10" 10" <br /> Sump Bottom to Top of Bottom Bottom <br /> Highest Pipe Penetration Penetrations Penetrations <br /> (inches) <br /> Test Start Time 12:32 12:37 <br /> Initial Reading .001 .001 <br /> Test End Time 1:02 1:07 <br /> Final Reading .001 .001 <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria ➢ .002 ➢ .002 <br /> Tightness Test Results P a s s P a s s <br /> Continuity Test Results N A N A <br /> Describe in Section 9 all tests marked "Fail"and any repairs made during the test. Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.