Laserfiche WebLink
Inspection Date: S— Retain Until Date: <br /> Inspector Name; V ; (36 months from <br /> Prior Inspection Date: 1 — 7 ins v� pection date) <br /> Tanks Inspected (ID#'s): <br /> Inspection Guidance: <br /> ➢ For equip � p equipment not included in this Standard follow the manufacturer recommended ins ecticnitesting schedules and procedures. <br /> ➢ The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure.This visual ins ecfion dlems.oes ed <br /> Inspector. It shall be performed by an owners inspector who is familiar with the site and can identify changes and develo in p not require ar �t� <br /> ➢ Upon discovery <br /> of water in the primary tank,secondary containment area, interstice, or spill container, remove promptly or take other correcf�ve action.Before <br /> discharge to the environment, inspect the liquid for regulated products or other contaminants and disposed of it properly. <br /> ➢ (*) designates e item in anon-conformance status. This indicates that action is required to address a problem. <br /> ➢ Non-conforming items imlportant to tank or containment integrity require evaluation by an engineer experienced in AST design,a Certified inspector,or a tank <br /> manufacturer who will determ ine the corrective action. Note the non-conformance and corresponding correcfive action in the comment section. <br /> ➢ Retain the completed checklists for 36 months.➢ In the event of severe weather (snow, ice, wind storms) or maintenance (such as painting)that could affect the operation of critical components <br /> (normal and emergency vents, valves), an inspection of these components is required as soon as the equipment is safely accessible after the event. <br /> Task <br /> Status Comments <br /> Item <br /> 1.0 Tank Containmen C <br /> 1.1 Containment heck for water, <br /> structure debris, cracks or fire ®Yes* ❑ No SkN A <br /> hazard ❑Yes* 2;—No <br /> 1.2 Primary tank Check for water <br /> Operable and in a *'es ❑ No* �&A <br /> 1.3 Containment closed position <br /> drain valves d <br /> 1.4 Pathways and Clear an Yes ❑ No* ❑ N/A <br /> entry gates/doors <br /> operable <br /> 2.0 Leak Detection Visible signs of ❑Yes* 'A No <br /> 2.1 Tank leakage <br /> 2.2 Secondary Visible signs of <br /> Containment leakage from tank []Yes* � No <br /> into secondary <br /> containment <br /> 2.3 Surrounding soil Visible signs of ❑Yes* No ❑ N/A <br /> leakage SEPTEN <br /> Visible signs of ❑Yes* No ❑ NIA <br /> 2.4 Interstice leakage <br /> AST INSPECTION STANDARD <br />