My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
1233
>
2300 - Underground Storage Tank Program
>
PR0547072
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 8:33:05 PM
Creation date
4/17/2026 4:51:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0547072
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0026688
FACILITY_NAME
7-ELEVEN INC. #41342
STREET_NUMBER
1233
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95205
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1233 E DR MARTIN LUTHER KING JR BLVD STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> T-1 RUL T-2 PUL Diesel <br /> Tank ID (one OPE per column) <br /> Are both vent and tank riser piping Yes Yes Yes r Yes <br /> secondarily contained? r No No r- No r- No <br /> OPE Model oPW oPW oPW <br /> W Shut off W Shut off W Shut off ' Shut off <br /> Flow Flow Flow Flow <br /> ' Restricts ' Restricts ' Restricts ' Restricts <br /> What is the OPE response when activated? Flow Flow Flow Flow <br /> (Check all that apply) '- Audible ' Audible ' Audible i Audible <br /> Alarm Alarm Alarm Alarm <br /> r Visual ' Visual ' Visual ' Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping r Yes* Yes* r Yes* r Yes* <br /> that may interfere with the OPE operation? l: No No No r No <br /> At what level in the tank is the OPE set to 105 103.75 105.375 <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank at <br /> which the OPE activates? 94.1 94 94.7 <br /> Is the OPE in proper operating condition to r Yes Yes r. Yes r- Yes <br /> respond when the stored substance reaches No No r No r No <br /> the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results r Pass Pass Pass Pass <br /> r Fail Fail Fail Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> *Mark here if: <br /> ''- Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br />
The URL can be used to link to this page
Your browser does not support the video tag.